BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a pipeline in Goleta, California. Completed plans call for site work for a pipeline.

Install five (5) Vertical Landfill Gas Extraction Wells and associated lateral per project plans prepared by County of Santa Barbara Public Works (COSBPW) titled "LFG System Modifications - Phase 2021-01" dated July 28, 2021. You must be licensed to perform such work in accordance with local, state, and federal laws. All questions should be submitted by 2:00 P.M., Friday, September 3, 2021 electronically Pursuant to Section 22300 of the Public Contract Code and the project specifications, the Contractor may substitute securities or request that the County make payment of retentions to an escrow agent for any money held by the County to ensure contract performance. The project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Pursuant to the provisions of Section 1770 et seq. of the California Labor Code, the Contractor shall pay not less than the prevailing rate of per diem wages as determined by the Director of the Department of Industrial Relations. A copy of the prevailing rate of per diem wages is on file at the General Services Department. Pursuant to the provisions of Section 4104 of the California Public Contracting Code a contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal or engage in the performance of any contract for public work, as defined in Section 4104, unless currently registered with the Department of Industrial Relations and qualified to perform public work pursuant to Section 1725.5 California Labor Code. The County reserves the right to reject any and or all bids or waive any informality in a bid. No bidder may withdraw his bid for a period of sixty (60) days after the date set for the opening thereof. The County reserves the right to select any one or any combination of bids, whichever is in the best interest of the County. The successful Contractor (after receiving the Notice to Proceed) shall have 60 calendar days to complete all work called for under the Contract Documents The liquidated damages will be $1,000 Dollars per day for project delays that are determined to be attributable to the Contractor.

Award

Pipeline

$150,979.00

Public - County

Site Work

8

6

7

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
22
Bidding Soon
357
All Active Projects
155
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2021

November 1, 2021

img_map_placeholder

14470 Calle Real, Goleta, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.