BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

The project includes the construction of an enclosed, elevated, fine screen and flowsplitting structure, and extension of existing on-site force main. Proposals must be accompanied by a certified or cashiers check or a bid bond from a surety company holding a permit in the State of Texas for an amount equal to 5% of the amount bid. The amount of said certified or cashier's check or bond will be forfeited to the Owner and the bank or surety shall be liable to the Owner for the amount in the event the successful bidder shall fail or refuse to enter into a contract or furnish bonds as hereafter required within ten (10) days after the date of notice of award. If a certified or cashier's check is provided, the successful bidder shall deliver, at the Engineer office (IDS Engineering Group, 13430 Northwest Freeway, Suite 700, Houston, Texas 77040), the original certified or cashier's check within twenty-four (24) hours of the bid opening. The successful bidder must furnish a performance bond and a payment bond on the forms provided, each in the amount of 100% of the Contract price from a surety company licensed by the State of Texas The Owner reserves the right to reject any or all bids and to waive informalities or irregularities in bidding.In case of lack of clarity in stating prices, the OWNER reserves the right to consider the most advantageous construction thereof, or reject the bid This work includes furnishing all labor, equipment and materials and performing all operations required for proper completion, installation and fabrication of all gates, valves, and accessories required to complete the work associated with sanitary sewer lift stations, water plants, and wastewater treatment plants as shown on drawings and specified herein It is further understood and agreed that the work is to be completed in full within 180 calendar days after notification to proceed

Post-Bid

Water / Sewer

$300,000.00

Public - County

Renovation, Site Work

16

14

5

Subscribe For Documents

83 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
59
Bidding Soon
2,739
All Active Projects
1,055
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2021

October 11, 2021

img_map_placeholder

To Be Determined, Houston, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.