Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 29, 2021 at 8:00 PM
Updated October 24, 2025
Site work and paving for a road / highway in Norridge, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Const. Variable Width Pav't. Resurfacing W/ Hot-mix Asph. Surf. Cse., Mix "D" N50, (2") (580 Ton), Incl. Level Binder (Mm, N50, (3/4"), 3450 Lbs Bit. Mat'l. (Tack Coat), 740 Sq Yd Protective Coat, 80 Sq Ft Detectable Warnings, 450 Sq Yd Topsoil Furn & Place, (3") & Sodding, 1 L Sum Traffic Control & Protection, Std. (701501, 701801), Assorted Drainage Apurtenances, Etc. Project Location: Sunnyside (Cumberland - Thatcher); Pontiac and Plainfield (Sunnyside - Cul-de-sac) Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764 ILDOT - Const. Variable Width Pav't. Resurfacing W/ Hot-mix Asph. Surf 21-00074-00-RS removal and replacement of defective curb & gutter, public sidewalk, the installation of ADA compliant sidewalk ramps, removal of the existing HMA pavement, base patching, asphalt binder and surface, drainage structure improvements, and landscape restoration.
Award
Roads / Highways
$247,800.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 31, 2021
September 30, 2021
Multiple Locations, Norridge, IL
Related To This Project
Norridge, IL
Bid Date: Nov 20 2025
Norridge, IL
Bid Date: Jul 10 2025
Norridge, IL
Bid Date: Jun 12 2025
Norridge, IL
Bid Date: Apr 10 2025
Norridge, IL
Bid Date: May 09 2025
Norridge, IL
Bid Date: Apr 11 2025
Norridge, IL
Bid Date: Mar 04 2025
Norridge, IL
--
Norridge, IL
--
Norridge, IL
Bid Date: Sep 25 2024
Norridge, IL
Bid Date: Aug 23 2024
Norridge, IL
Bid Date: Apr 18 2024
Norridge, IL
Bid Date: Feb 22 2024
Norridge, IL
Bid Date: Aug 09 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
