BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a residential development in Ocala, Florida. Completed plans call for the demolition of a residential development; and for site work for a residential development.

Demolition and Removal of Structure 1712 South West 5th Street. The City of Ocala is seeking quotes from contractors to demolish and remove a single-family home, a shed, three dead trees and overgrowth located at 1712 SW 5th St, Ocala, FL 34471. Information and requirements for this listing are outlined on the attached exhibits: Exhibit A - Scope of Work Exhibit B - Photos. This project consists of the following: 1. Termination of water and sewer connections at the property line (city meter/sewer laterals) prior to beginning demolition work. 2. Demolition and removal of a single-family home, shed, three (3) dead trees, overgrowth, structural debris, structure contents, improvements, and fencing on the property listed above. 3. The ground where the buildings are removed will be leveled, and if on a grade, sodded. 4. Any fuel tanks found must be pumped, disconnected, crushed, and backfilled or pumped and completely removed from the property according to Chapter 62-761 of the Florida Administrative Code. 5. Public sidewalks and driveway aprons must remain intact. Any damage to sidewalks or driveway aprons by the Contractor will be repaired at the Contractor`s expense. 6. Any septic tanks will be pumped, crushed and back-filled, according to City requirements, Florida Building and Plumbing codes, and the Marion County Health Department. 7. Any water wells will be capped according to City requirements and Florida Building and Plumbing codes. 8. Underbrush, overgrowth, and all debris must be removed from the property. All trees, except for those that are dead, shall remain. 9. Property shall be graded to final grade, using a box blade. Licensing and Experience Requirements 1. Licensing Requirement: Contractors must submit proof that they possess a current, active Asbestos Supervisor license. A. The City of Ocala and NESHAP requires an asbestos-trained person be on site. Federal 40 CFR 61.145(c)(8) states in part, "no RACM shall be stripped, removed, or otherwise handled or disturbed at a facility regulated by this section unless at least one on-site representative, such as a foreman or management level person or other authorized person trained in the provisions of this regulation and the means of complying with them is present." DEP requires this "trained person" to be on site when non-friable ACM is present, or is discovered, so problems can be caught early and corrected without delay. B. Note: An Asbestos Survey report is not required for this demolition. 2. Experience Requirement: Bidder must possess three 3 years' experience in providing demolition services.Licensing and Experience Requirements Permit Requirements 1. City of Ocala Demolition Permit: A. Contractor must obtain a City of Ocala demolition permit. B. If Contractor isn`t already "certified" with the City of Ocala, Contractor must complete the Contractor Certification Application prior to applying for a City Demolition Permit. C. The application for demolition permit is available electronically. D. It is the responsibility of the Contractor to obtain the approval signatures of the appropriate representatives of the following agencies listed on the City of Ocala Demolition Permit Application: gas, telephone, telecommunication, water and electric utilities, Cox Cable, a licensed exterminator, planning and environmental review from the City of Ocala`s Growth Management Department. 2. Marion County Permits: In addition to any City required permits, septic tank permits must be obtained from the Marion County Growth Management Services Department, located at 2710 East Silver Springs Boulevard, Ocala, FL 34470. Information regarding septic tank permitting can be obtained by calling the septic permitting office at (352) 438-2417. 3. Estimated Permit Fees: The estimated fees and allowance for this project is $104. Please include this allowance amount in your lump sum bid amount. Demolition Timeframe 1. Contract Time: Work must be completed and ready for final payment within 30 days of the City-issued Notice to Proceed (NTP). 2. Weather Days: The Contractor shall submit a written request to the City Project Manager (email is the preferred method) for additional days for which work is suspended or delayed by weather. Weather days shall be reconciled with each monthly pay application for the time period which the application is submitted and shall be final. Contractor performance and execution of work will be considered in the determination for granting additional days. Contractor Responsibilities 1. Scheduling of demolition shall be coordinated through Jeff Ball, City of Ocala Code Enforcement, (352) 629-8309, jball@ocalafl.org. 2. Contractor shall promptly secure all necessary permits, inspections and approvals required and allow inspection of all work by authorized personnel. 3. No work shall commence until the contractor has submitted proof of #62-257.900(1) - Notice of Demolition* to FDEP and provide proof of mailing to the City Project Manager. 4. Contractor must wait ten (10) business days (excluding holidays as observed by the State of Florida) after the confirmed delivery date, prior to starting demolition. Acceptable forms of proof are as follows: o USPS Certified Mail receipt o FedEx tracking receipt o Similar mailing methods, where delivery date can be verified. 5. *FDEP form 62-257.900(1) - Notice of Demolition is available electronically 6. The Contractor shall complete all work performed under this contract in accordance with policies and procedures of the City of Ocala and all applicable State and Federal laws, policies, procedures, and guidelines. 7. The Contractor shall obtain and pay for any and licenses, additional equipment, dumping and/or disposal fees, etc., required to fulfill this contract. 8. Contractor shall leave the property at once, without altercation, if advised to leave by law enforcement or a person claiming to be the property owner and/or property owner`s representative. Immediately after leaving, contact the City Project Manager and advise them of the situation. 9. Contractor will be responsible for inspector's overtime. 10. Provide on-site sanitary facilities as required by Governing agencies. 11. Contractor is responsible for any and all damages including but not limited to buildings, curbing, pavement, landscaping, or irrigation systems caused by their activity. Should any public or private property be damaged or destroyed, the Contractor, at their expense, shall repair or make restoration as acceptable to the City of destroyed or damaged property within forty-eight (48) hours of notification from the City. Liquidated Damages 1. The Contractor shall pay the City $100.00 for each calendar day that expires after the time specified for completion, until work is completed. 2. Nothing in this section is intended to limit the right to obtain injunctive relief or any and all relief as may be appropriate. Permission allowing the Contractor to continue and finish any part of the work after the time fixed for its completion or after the date to which the time for completion may have been extended shall in no way operate as a waiver on the part of the City of any of its rights under this solicitation. The City of Ocala is seeking quotes from contractors to demolish and remove a singlefamily home, a shed, three dead trees and overgrowth located at 1712 SW 5th St, Ocala, FL 34471. Information and requirements for this listing are outlined

Award

Residential Subdivision

$7,994.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
64
Bidding Soon
1,153
All Active Projects
492
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2021

October 4, 2021

img_map_placeholder

1712 SW 5th St, Ocala, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.