BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 20, 2021 at 8:00 PM

Updated July 12, 2025

Site work and new construction of a medical facility in Centralia, Washington. Completed plans call for the construction of a 15,416-square-foot, 16-bed medical facility.

Bids will be accepted prior to the dates and times listed above for each bid package, at the offices of GC/CM, Foss Landing, 1940 East D Street, Suite 300, Tacoma, WA 98421.. Proposals received after the time noted above will not be considered. Bids will be publicly opened and read aloud virtually. The GC/CM and Owner reserve the right, to reject any or all bids and to waive any informalities or irregularities on the bids received. BOND GUARANTEE: A bid bond in the amount of 5% of the base bid amount is required on all bids exceeding $300,000. PERFORMANCE BOND: All bid packages $300,000 or greater require payment and per-formance bonds on the forms pro-vided in Section 005213 -- Form of Contract. Deadline for questions is September 3rd, 2021, at 5pm. Final Addendum if any will be issued no later than September 10th, 2021. Questions should be directed to: jjulius@korsmo.com. Trade Contractor recognizes Korsmo has an agreement with the fol-lowing Union; Pacific Northwest Regional Council of Carpenters, & Laborers. In accordance with ROW 39.10.380 Subcontractor Bidding Procedure, Trade Contractors shall be obligated and bound to such agreements for work claimed by the carpenters and laborers Unions. Should any of Trade Contractor work (includ-ing work of lower tier subcontrac-tors) be claimed by this Union, Subcontractor will enter into an agreement with this Union for performance of the claimed work on this project. Construction broke ground October 18, 2021 and is expected to be complete by September 2022. Overall Project Budget is $14 Million. Budget for this bid package is $345,000. The voluntary Diverse Business goal of 26%, which is an aggregate of: 10% Minority Business Enterprises (MBE), 6% Women Business Enterprises (WBE), 5% Veteran-owned Business, and 5% Washington Small Businesses selfidentified in the Washington Electronic Business Solution (WEBS). *Addendum #1 - Due Date changed *Addendum #2 - Addendum #2 has been issued. Please make sure to acknowledge it on the bid form. Bid due dates remain the same.

Under Construction

Medical

$345,000.00

Public - State/Provincial

New Construction, Site Work

12

84

43

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
87
Bidding Soon
1,156
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2021

October 18, 2021

Project location map

E Maple St, Centralia, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.