BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Centralia, Washington. Completed plans call for the renovation of a municipal facility.

Centralia City Light is required by the Revised Code of Washington (RCW) 35.92.350 to request that any person, firm or corporation desiring to bid upon any electrical construction or improvement work answer questions contained in a standard form of questionnaire and financial statement, including a complete statement of their financial ability and experience. Centralia City Light maintains a prequalified contractor list for distribution, transmission, substation and secondary work. Electrical contractors or subcontractors interested in bidding on utility type work for Centralia City Light must be prequalified at the time the bid solicitation is advertised. State law also requires that prequalified contractors annually update their prequalification questionnaire. We are currently in the process of establishing the prequalification list valid for the year 2024. Prequalification may be established any time within the calendar year. Consistent with State Law (RCW 35.92.350), the prequalification status of electrical contractors must be confirmed before we can provide bid submittal forms to parties interested in bidding on electrical work. Centralia City Light's solicitation for bids will identify the contractors prequalified to perform the electrical work listed for the project. There is no fee to prequalify. If you have questions about the Centralia City Light prequalification process, please contact: Danielle Hansen Centralia City Light 1100 N Tower Avenue Centralia, WA 98531 360-330-7512 dhansen@cityofcentralia.com. Centralia City Light may complete an "Electrical Contractor Performance Review" form evaluating the performance of a prequalified contractor following completion of a project. This form will be used to determine the adequacy of the work performed on the project including quality of work, adequate manpower and equipment, as well as the ability for the contractor to perform work for Centralia City Light in the future. We will share the completed evaluation with the contractor. Any exception a contractor has with the comments on the form should be directed to the project manager within thirty (30) days of receipt. Failure to adequately respond to a poor evaluation within this time frame may be cause for rejection of future bids and removal from the Centralia City Light Prequalification List.

Post-Bid

Municipal

$300,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
28
Bidding Soon
661
All Active Projects
289
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2024

March 11, 2024

img_map_placeholder

Multiple Locations, Centralia, WA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.