BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a civil project in New Franklin, Missouri. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

**As of November 24, 2021, the project was awarded to Diamond Engineering in the amount of $919,740.05. The start and completion date has not yet been determined. INVITATION FOR BID Public notice is hereby given that Buffalo County, Nebraska invites sealed bids for furnishing necessary equipment, labor, materials and incidentals to complete Structure No. C001012210 Replacement. Scope of Work: Project includes traffic control, removal of existing bridge, construction of 88 ft. long, clear span concrete deck, steel girder bridge with open concrete bridge guardrail, approach grading, approach guardrail installation, and associated work. Bids shall be submitted to: Ms. Janice Giffin, P.O. Box 1270, Kearney, NE 68848. Designate project name on the envelope. Bids shall include: Bid Bond in the amount of 5% of the total base bid. Certified check, cashier's check or bid bond made payable to Owner. Selected bidder shall supply: Performance Bond and Payment Bond in the amount of 100% of the total base bid. Considerations: Contract documents can be obtained by contacting Oak Creek Engineering, (308) 455-1152. Contract documents must be purchased in hard copy, requiring a nonrefundable fee of $50.00. Bids shall be submitted on furnished forms, sealed and marked with bidder contact information. Owner reserves the right to reject any or all bids, hold bids for 15 days and select most beneficial bid. ZNEZ Ag28,S4,S11 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Engineer's estimate: $500,000.00 - $1,000,000.00 SECTIONS 24/25, TUN, R18W Project Location: 235th Road over Wood River, 1/2 mile east of Highway 40 August 1, 2022

Award

Bridges / Tunnels

$919,740.00

Public - County

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
25
Bidding Soon
332
All Active Projects
131
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2021

January 10, 2022

img_map_placeholder

US-40, New Franklin, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.