BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 15, 2021 at 8:00 PM

Updated September 15, 2023

Site work for a water / sewer project in Antioch, Illinois. Completed plans call for site work for a water / sewer project.

As of October 15, 2021, project was awarded to Rehabilitation Technology Ltd for $377,205.04. All Work, materials, and equipment are to be in accordance with the Contract Documents on file in the office of the Village Administrator, and at the office of HR Green, Inc. ("ENGINEER"), 1391 Corporate Drive, Suite 203, McHenry, IL 60050, by this reference made a part hereof as though fully set out and incorporated herein. The Work for the said improvement, as required by the Contract Documents, is generally described as follows: The project includes furnishing all labor, materials, and equipment necessary for the rehabilitation, of approx. 171 sanitary manholes. Rehabilitation includes varying amounts of lining, external chimney seals, frame adjustments, curtain grouting, bench repair, grouting and wiping joints, and site surface restoration. The Village of Antioch, Illinois, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color or national origin in consideration for an award. Work under the proposed Contract Documents shall be commenced upon written Notice to Proceed to be issued on or before October 1st, 2021, and shall substantially complete on or before December 3rd, 2021, and be finally complete on or before December 17 th , 2021, subject to any extension of time, which may be granted by the OWNER

Award

Water / Sewer

$377,205.00

Public - City

Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
525
Active Projects
280
Bidding Soon
3,784
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2021

October 1, 2021

Project location map

To Be Determined, Antioch, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.