Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published December 12, 2023 at 7:00 PM
Updated January 27, 2024
Site work, outdoor lighting and addition to a bridge / tunnel in Antioch, Illinois. Completed plans call for the addition of a bridge / tunnel; for site work for a bridge / tunnel; and for outdoor lighting for a bridge / tunnel.
The Project includes the following Work: The Project focus is to redevelop an existing site of approximately 4.5 acres into a new park. The project will include daylighting of the Sequoit Creek channel between Main Street and Orchard Street, which will be of various sizes and types of stone installation, stone walls, a cast in place pedestrian bridge, cast in place concrete structures, and site restoration. Additional work will include installation of underground utilities, including sanitary sewer, storm sewer, and water/sewer service lines; installation of electrical and lighting improvements; reconstruction of Depot Street; installation of a splash pad, playground equipment, and a prefabricated pavilion; construction of a restroom/concession facility; and miscellaneous site improvements, such as concrete walkways, decorative walls, decorative paver areas, irrigation, and landscaping. The Bid must be accompanied by Bid security made payable to OWNER in an amount of 5% of the Bidder's maximum Bid price. This Project is being supported, in whole or in part by federal award number SLT 3381 awarded to the State of Illinois by the U.S. Department of the Treasury. Bidders will be required to comply with all laws, including those relating to the employment of labor and the payment of the general prevailing rate of hourly wages in the locality in which the work is to be performed for each craft or type of worker or mechanic needed to execute the contract or perform such work, also the general prevailing rate for legal holiday and overtime work (including, but not necessarily limited to "Prevailing Wages (Davis Bacon Act) (820 ILCS 130/0.01 et seq.)" as ascertained by the Village or by the Illinois Department of Labor for Lake County, Illinois shall be paid for each craft or type of worker needed to execute the contract or to perform such work. If at the time this Contract is executed, or if during the term of this Contract, there is excessive unemployment in Illinois as defined in the Employment of Illinois Workers on Public Works Act, 30 ILCS 570, as two consecutive months of unemployment exceeding 5%, CONTRACTOR agrees to employ a work force that consists of at least 90% Illinois laborers. An "Illinois laborer" is defined as any person who has resided in Illinois for at least 30 days and intends to become or remain an Illinois resident. The Bidder shall require all subcontractors (if any) to conform with said laws, and any rules or regulations now and thereafter issued pursuant to said laws by Bidder, his subcontractors, and/or anyone working through or on behalf of Bidder or Bidder's subcontractors. Bidders shall comply with the President's Executive Order No. 11246, Equal Employment Opportunity as amended. Bidders shall comply with the following Illinois Department of Commerce and Economic Opportunity (DCEO) requirements: Steel Products Procurement (Domestic Steel) (30 ILCS 565 et seq.) Compliance with Business Enterprise Program Goal (30 ILCS 575/0.01; 775 ILCS 5/2 105)-30%; 25% MBE and 5% WBE. BEP Compliance is evaluated for the total of DCEO Funded portion of the project: 5% WBE Participation (5% * $2,750,000 = $137,500.00) 25% MBE Participation (25% * $2,750,000 = $687,500.00) Illinois Works Jobs Program Act ( 820 ILCS 130/0.01 et seq.) Illinois Works Apprenticeship Initiative (30 ILCS 599/20 20 to 20 25) Illinois Workers on Public Works Act (30 ILCS 570/0.01 et seq.) Bribery (30 ILCS 500/50 5) Bid Rigging (720 ILCS 5/33E 3 or 720 ILCS 5/33E 4) Forced Labor Act (30ILCS 583) Goods from Child Labor Act (30 ILCS 584) The Village of Antioch reserves the right to reject any or all Bids, in whole or in part, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 85 days after the time set for receiving Bids. Contract award shall be made based on the lowest responsive and responsible Bidder.
Award
Bridges / Tunnels
$12,585,446.00
Public - City
Addition, Outdoor Lighting, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 17, 2023
June 16, 2023

To Be Determined, Antioch, IL
Related To This Project
Antioch, IL
Bid Date: Jun 06 2023
Antioch, IL
Bid Date: Jun 21 2023
Antioch, IL
Bid Date: Jul 18 2023
Antioch, IL
Bid Date: Sep 06 2023
Antioch, IL
Bid Date: Feb 08 2022
Antioch, IL
Bid Date: Mar 15 2022
Antioch, IL
Bid Date: Apr 11 2023
Antioch, IL
Bid Date: Mar 22 2023
Antioch, IL
Bid Date: Feb 21 2023
Antioch, IL
Bid Date: Feb 01 2023
Antioch, IL
Bid Date: Sep 14 2021
Antioch, IL
Bid Date: Jan 17 2023
Antioch, IL
Bid Date: Jan 24 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.