BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 3, 2023 at 8:00 PM

Updated January 27, 2024

Site work for a water / sewer project in Alamo, New Mexico. Completed plans call for site work for a water / sewer project.

The Project consists of: Installation of a 12-14" diameter, 20-foot-long surface casing; Drilling of a 10" borehole up to 700 feet below ground surface (bgs); Conducting geophysical logging; Constructing a 6-inch (OD) diameter well as specified; Performing pump tests; Procurement and setting the well pump; Installation of pit less adapter unit and wellhead Questions must be received by no later than 5:00 pm on October 10, 2023 October 13, 2023. NO EXCEPTIONS. Questions shall be emailed to mike.scrudato@wsp.com

Award

Water / Sewer

$706,982.00

Public - Federal

Site Work

9

16

4

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
6
Bidding Soon
170
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2023

November 27, 2023

Project location map

To Be Determined, Alamo, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.