Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published December 2, 2021 at 7:00 PM
Updated September 15, 2023
Site work for a water / sewer project in Fontana, California. Completed plans call for site work for a water / sewer project.
In general, the project is located on Valley Blvd. W/O Sierra to Palmetto requires the contractor to provide all materials, equipment, labor, tools, and incidentals as required by the contract documents. This project consists of the new installation of approximately 500 LF of 15-inch VCP, 20 LF of 10-inch VCP and the install of CIPP liner on the existing 3,000 ft. of sewer line. Response Types : Line Items Subcontractor Bid Bond General Attachment Type of Award : Lump Sum License Requirements : Class "A" contractor's license or a combination of Class "C" specialty contractor's license(s) sufficient to perform the work Liquidated Damages : Five Hundred Dollars ($500.00) per day for each and every calendar day of delay beyond the Contract Time or beyond any completion schedule Project Duration : fifty (50) working days from the date of contract execution. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 10/07/2021 2:00 PM (PDT) The work of improvement consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications and Contract Documents for the above stated project. The Contractor shall assume sole, complete, and continuous responsibility for stormwater runoff management and erosion/sedimentation control during construction. The Contractor shall know and fully comply with the applicable provisions of the Manuals and Federal, State, and local regulations that govern the Contractor's operations and stormwater discharges from both the project site and areas of disturbance outside the project limits during construction. The Contractor shall prepare a stormwater management plan for all associated construction activities. This plan shall include drawings showing methods for erosion and sediment control, sediment treatment control, wind erosion, vehicle and equipment tracking control, and non-stormwater waste management. The plan shall outline what measures will be used as conditions change along the alignment. The plan shall also include a description of the sequence of construction and all stormwater control procedures to be used.
Award
Water / Sewer
$657,031.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
