BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 18, 2021 at 8:00 PM

Updated September 14, 2023

Site work for a municipal facility in Boston, Massachusetts. Completed plans call for site work for a municipal facility.

Erich Lindemann Building - Existing Fuel Oil System Upgrades Project, Boston, MA. This project consists of upgrades to the existing fuel oil system, including replacement of existing emergency generator day tank fuel oil transfer system with new packaged fuel oil transfer system, remote-mounted transfer system control panel, main storage tank, interconnecting secondary containment piping system with two service pipes, and various fuel oil controls devices and accessories. Contractor Qualification DCAMM Certificate

Bid Results

Municipal

$202,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
576
Active Projects
298
Bidding Soon
4,102
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2021

November 8, 2021

Project location map

25 Staniford St, Boston, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.