BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Fishers, Indiana. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

a. Full depth removal and replacement, crack repairs, mill and overlay of existing HMA pavement b. Minimal curb replacement to account for curb broken by plows, etc. c. Change from previous bid is that temporary markings are not required. d. Condition of construction timeline is different based on coordination between owner and future awarded contractor. The initial schedule stipulated that the work be complete by end of 2021, new anticipated schedule completion is end of 2022. This work for Indianapolis Metropolitan Airport consists of bituminous milling, bituminous pavement repairs, placement of bituminous surface course, concrete curb repairs, and other miscellaneous repair work for the main vehicle parking area adjacent to the airport office and FBO. Bituminous pavement repairs will consist of the full depth removal and replacement of bituminous concrete pavement and subgrade materials at locations designated by the Engineer. Smaller cracks less than 1-1/2-inch wide will be sealed or filled with hot-applied mastic sealant. Cracks larger than 1-1/2 wide will be filled with hot-applied mastic sealant. Concrete curb repairs will consist of the removal and replacement of broken curb at locations designated by the Engineer and shown in the plans. Additive Alternate 1 is the replacement of the existing concrete parking blocks with new concrete parking blocks. Additive Alternate 2 consists of the repair of the HMA pavement to be used as the staging area. Damage to the pavement outside of the patch location shown caused by the Contractor's operations shall be repaired at no cost to the Owner. As of October 25, 2021, the project was rejected for they only receive one bid. Will go on re bid in the future date. Each bid shall include all work, labor, equipment, and materials necessary to complete the project as required in strict compliance with the drawings and specifications (Plans) prepared by Crawford, Murphy, & Tilly, 8790 Purdue Road, Indianapolis, Indiana 46268. Pursuant to the repeal of Indiana Code 5-16-7, effective July 1, 2015, common construction wages are not required on this project. In accordance with Indiana Code Section 5-16-13-1, et seq., prequalification with the Indiana Department of Administration (IDOA) or the Indiana Department of Transportation (INDOT) is required of all contractors, in any contractor tier, performing work under contract to the IAA which is estimated to be One Hundred Fifty Thousand Dollars ($150,000) or greater. All bids shall be accompanied by a scanned copy of the bid bond in an amount of not less than 5% of the contract amount. Original copy of the bid bond will be requested from the successful bidder immediately following the bid opening. Contractors awarded a contract will be required to furnish acceptable surety bonds in the amount of 100% of the contract price. Said performance, material and payment bond shall remain in effect for twelve (12) months after the date of the Owner's final acceptance of Contractor's work. Should a successful bidder withdraw their bid or fail to execute a satisfactory contract within seven (7) days the Indianapolis Airport Authority may declare the bid deposit forfeited. The Indianapolis Airport Authority reserves the right to reject any and all bids. The Bidder's attention is directed to the fact that the maximum amount of work that may be subcontracted on the project will be 50% of the total amount of the bid. The Owner has established goals for certified Minority Owner Business Enterprises ("MBE"), Women Owner Business Enterprises ("WBE") and Veteran Owned Business Enterprises ("VBE") participation. The MBE/WBE/VBE participation goal for this project is 20%. Overall Participation Goal is 20% cumulative participation comprised of MBE, WBE and/or VBE. Goals for minority participation for each trade: 12.5% Goals for female participation in each trade: 6.9%

Post-Bid

Sidewalks / Parking Lot

$150,000.00

Public - City

Paving, Site Work

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
34
Bidding Soon
788
All Active Projects
288
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 6, 2021

January 5, 2022

img_map_placeholder

9913 Willow View Rd, Fishers, IN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.