BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a bridge / tunnel in Niverville, Manitoba. Completed plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

Reference Number 0000226040 Source ID PU.MU.MB.1017311.C102422 Agreement Type Canadian Free Trade Agreement (CFTA) Agreement Type 2 New West Partnership Trade Agreement (NWPTA) Agreement Type 3 North American Free Trade Agreement (NAFTA) Bid Intent Not Available Question Acceptance Deadline 2022/07/11 02:00:00 PM CDT Questions are submitted online No The Rural Municipality (RM) of Stuartburn is accepting design-build proposals for the removal and replacement of the Prawda School Road Inter-Municipal Bridge (Prawda Bridge). The Prawda Bridge is jointly owned by the RM of Emerson-Franklin and the RM of Stuartburn. The bridge is currently single-lane and crosses the Rat River. It was once owned by Manitoba Infrastructure and previously known as inventory #4046-00. It consists of a single span 9.0m long and 5.8m wide timber bridge that was constructed in the 1960's that has reached the end of its service life and requires replacement. The RM has been approved for funding under the Investing in Canada Infrastructure Program (ICIP). Funding is shared between the Federal Government of Canada, the Province of Manitoba and the RM of Stuartburn. The budget available for detailed design and construction activities of a replacement is slightly more than $700,000. Preliminary engineering and environmental engineering were completed in recent months with respect to the replacement and the site itself. The following technical reports have been completed and have been made available to Proponents of this RFP in Appendix B: o Hydraulic Assessment and Preliminary Design (Trek Geotechnical, 2022) o Geotechnical Report (Trek Geotechnical, 2022) o Preliminary Review of Environmental Impacts and Regulatory Requirements (Toews Environmental, 2022) Preliminary engineering led to the following two options being recommended: Option 1 - Single Span 22 m Long Bridge Structure Option 2 - Single 17.1 m Span by 3.52 m Rise Corrugated Steel Arch Culvert Based on preliminary cost estimates by the Project Manager, the most economical structure would be comprised of a weathering steel superstructure with corrugated steel or timber decking and gravel wearing surface, a concrete sub structure with CIP footing or CIP caisson foundations, CIP abutmentwall/cap and lock-block or similar wingwalls. In the case the proponent chooses a culvert crossing, approval to modify the ICIP funding description from a bridge crossing to a culvert crossing would need to be attained, and would be dependent on this approval timeline and acceptance prior to proceeding with detailed design and construction. Proponents are not limited to these designs and are encouraged to propose the best solution for the bridge replacement. The project must achieve substantial performance by March 31, 2023 and final completion by April 15, 2023 or liquidated damages of $500/day will apply. See Form of contract for more details. 1.2 Site Location The Prawda School Road Bridge (Rd 30E) over the Rat River is located along the border and is shared between the RM of Emerson-Franklin and the RM of Stuartburn, located between Mile Roads 15N and 16N, legal description of NE 24-03-05E, and UTM coordinates of 14U X661524, Y5455618. A map of the relative bridge location is provided in Appendix A. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Bridges / Tunnels

$809,000.00

Public - County

Demolition, New Construction, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
10
Bidding Soon
225
All Active Projects
88
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2022

November 15, 2022

img_map_placeholder

Rd 30 E, Niverville, MB

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.