BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 25, 2022 at 8:00 PM

Updated August 13, 2024

Site work, paving and renovation of a mixed-use development in Kalamazoo, Michigan. Completed plans call for site work for a sidewalk / parking lot; for the renovation of a pre-engineered storage facility; for paving for a sidewalk / parking lot; pre-engineered storage facility; pre-engineered storage facility; and water / sewer project.

For Biological Foul Air Mitigation System - Construction Questions about this IFB should be directed to: Department Contact: Ryan Stoughton, PE, Assistant City Engineer at stoughtonr@kalamazoocity.org The City reserves the right to postpone the bid opening for its own convenience

Bid Results

Water / Sewer

$8,631,418.00

Public - City

Paving, Renovation, Site Work

47

19

17

5

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
227
Active Projects
166
Bidding Soon
1,434
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2022

July 25, 2022

Project location map

1415 Harrison St, Kalamazoo, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.