BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a civil project in Sunnyvale, California. Conceptual plans call for the construction of a water / sewer project.

As originally envisioned in the Master Plan, this project entails implementing a facility that would store and feed fats/oils/grease (FOG) and food waste to the digesters. FOGs are a significant and problematic component of domestic wastewater. In order to avoid FOG buildup in pipelines and the treatment processes, grease loads will be trucked directly to the Water Pollution Control Plant (WPCP) for treatment. Decomposition of food waste in landfills generates greenhouse gases such as methane. When this project was initiated, it was assumed that digesting FOG and food waste would be economically beneficial only if excess digester capacity is used. It was planned that a FOG and food waste market analysis would be completed at the onset of this project. The estimated cost assumes the following major project elements: (1) FOG and food waste receiving program development; (2) 3,000 gallon per day FOG storage and feed facility with associated storage tank, grinder pumps, and feed pumps; and (3) 3,000 gallon per day emulsified food waste storage and feed facility with associated storage tank, grinder pumps, and feed pumps. Although the Master Plan contemplated digesting both FOG and food waste, it is now anticipated that the facility will be receiving mostly food waste since FOG is no longer as readily available. Since the approval of the Master Plan, the State has passed Senate Bill (SB) 1383 which establishes state targets to achieve a 75 percent reduction in the level of statewide disposal of organic waste by 2025. To achieve these aggressive reduction goals, municipalities are required to secure processing capacity and implement comprehensive organics diversion programs. As September 22, 2022, this project is currently in the FY 2022 - 2023 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2023 - 24. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023 - 24. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$2,021,789.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
69
Bidding Soon
1,442
All Active Projects
620
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2024

img_map_placeholder

To Be Determined, Sunnyvale, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.