BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, paving and new construction of a bridge / tunnel in Hollister, California. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This project consists of replacing the existing bridge structure on Union Road spanning the San Benito River including approach roadway improvements. The new bridge will be constructed along a new alignment to the south from the existing location and the intersection of San Benito Street and Union Road would be relocated with an approximate 350-foot extension of San Benito Street to the realigned portion of Union Road. The intersection at Cienega Road and Union Road would be reconstructed with a slight adjustment to orient the intersection with the realigned Union Road. The existing structure will remain to carry the existing traffic during the construction of the new structure and then removed once the new structure is built and traffic diverted onto it. Existing and previous bridge structures would be removed from the river channel following completion of the new bridge, and riparian vegetation would be restored. As of June 1, 2023 a general contractor has been awarded. Construction is anticipated to start in June or July 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Engineer's Estimated Cost: $36,000,000 to $37,500,000 Bid Bond Percentage: 10 Project Duration: 440 Workdays DBE Goal Percentage: 18% Liquidated Damages: $11,500.00 Per Calendar Day *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$36,329,582.00

Public - City

Demolition, New Construction, Paving, Site Work

266

25

30

11

Subscribe For Documents

80 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
48
Bidding Soon
1,191
All Active Projects
503
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2023

July 3, 2023

img_map_placeholder

Union Rd, Hollister, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.