Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a bridge / tunnel in Hollister, California. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
This project consists of replacing the existing bridge structure on Union Road spanning the San Benito River including approach roadway improvements. The new bridge will be constructed along a new alignment to the south from the existing location and the intersection of San Benito Street and Union Road would be relocated with an approximate 350-foot extension of San Benito Street to the realigned portion of Union Road. The intersection at Cienega Road and Union Road would be reconstructed with a slight adjustment to orient the intersection with the realigned Union Road. The existing structure will remain to carry the existing traffic during the construction of the new structure and then removed once the new structure is built and traffic diverted onto it. Existing and previous bridge structures would be removed from the river channel following completion of the new bridge, and riparian vegetation would be restored. As of June 1, 2023 a general contractor has been awarded. Construction is anticipated to start in June or July 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Engineer's Estimated Cost: $36,000,000 to $37,500,000 Bid Bond Percentage: 10 Project Duration: 440 Workdays DBE Goal Percentage: 18% Liquidated Damages: $11,500.00 Per Calendar Day *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Bridges / Tunnels
$36,329,582.00
Public - City
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2023
July 3, 2023
Union Rd, Hollister, CA
Related To This Project
Hollister, CA
--
Hollister, CA
Bid Date: Sep 09 2024
Hollister, CA
Bid Date: Aug 31 2022
Hollister, CA
Bid Date: Aug 31 2022
Hollister, CA
Bid Date: Jul 23 2020
Hollister, CA
Bid Date: Mar 09 2022
Hollister, CA
Bid Date: Jul 14 2022
Hollister, CA
Bid Date: Jul 19 2022
Hollister, CA
Bid Date: Aug 15 2022
Hollister, CA
Bid Date: Jul 12 2022
Hollister, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.