EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 7, 2021 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Schiller Park, Illinois. Completed plans call for site work for a water / sewer project.

The location of the services to be performed for this contract is the ELGIN O'HARE WESTERN ACCESS TOLLWAY (I-490) at the former Concrete Specialties property along Franklin Avenue in the Village of Bensenville, Cook County, Illinois. Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 4265D.4597_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on September 16, 2021 Bidders are responsible for the purchase of Complete Printed Sets and Complete Set Downloads In the event there is a discrepancy between the electronic and hard copy documents distributed by the on-line plan room, the printed documents take precedence The final date for Plan holder Questions as stated in the pre bid meeting is September 24, 2021 at 2:00 PM

Post-Bid

Water / Sewer

$55,426.00

Public - State/Provincial

Site Work

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Closeout Submittals, Warranties
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
147
Bidding Soon
2,369
All Active Projects
1,019
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2021

January 15, 2022

img_map_placeholder

Franklin Ave, Schiller Park, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Concrete Pipe Management

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.