BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Millbrae, California. Completed plans call for the renovation of a water / sewer project.

**As of July 09, 2024, this project has not yet been awarded. The Project is expected to be awarded on July 23, 2024.** The work to be performed under this contract consists of the following major items of work as listed below and as further described in the solicitation documents: (1) Mobilization (2) Demolition (3) Thickener tank blasting, and epoxy lining of sludge thickener tank (4) Furnish sludge thickener mechanical and electrical equipment (5) Install sludge thickener mechanical and associated equipment (6) Electrical installation (7) Thickener startup, testing, training, and turnover (8) Digester No. 2 gas dome, center pipe, and manhole hatch abrasive blasting and coating (9) Repair for cracks using epoxy or grout (10) Spalling repair Work of this Contract is identified on the Drawings, in the technical Specifications and in the Bid Item Description pages of Section 01025 and Section 01026. In summary: 1. Work related to the Sludge Thickener includes: a. Demolition of mechanical equipment for the Sludge Thickener, including the drive, rotating mechanism, scum baffle, scum trough, rake arms, and associated parts.Removal of the existing tank interior lining; concrete repair and substrate preparation; and installation of new lining on the interior concrete surfaces of the Sludge Thickener. c. Recoating of interior surfaces including the walls, ceiling, and other interior surfaces. d. Installation of new mechanical equipment for the Sludge Thickener, including the rotating mechanism, scum baffle, scum trough, rake arm and associated parts. e. Installation of new influent pipe and scum pipe, including associated supports. f. Removal of existing access hatches in concrete thickener cover and replacement with new aluminum access hatches. 2. Work related to Digester No. 2 includes: a. Removal of the existing coating; substrate preparation; and installation of new coating on the exterior gas dome surface and supports. b. Removal of the existing coating; substrate preparation; installation of new coating on the exterior surfaces of the vertical center mixing pipe. c. Removal of the existing coating and gasket; substrate preparation; installation of new coating on the exterior and underside/interior surfaces of the two (2) manhole access hatches and installation of new gaskets. Engineer's Estimate for this project is $853,081. Question Deadline 05/03/2024 at 12:00 PM PT Online Q&A Yes

Post-Bid

Water / Sewer

$853,081.00

Public - City

Renovation

15

22

13

7

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
85
Bidding Soon
1,785
All Active Projects
728
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

August 15, 2024

img_map_placeholder

400 E Millbrae Ave, Millbrae, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.