Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 1, 2021 at 8:00 PM
Updated October 17, 2024
Site work, paving and outdoor lighting for a transportation facility in Orlando, Florida. Conceptual plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.
Professional Design services (Services) to the Authority for, Selection of Design Services for ORL East Ramp Rehabilitation - Phases 1, 2 & 3 (Project) at the Orlando Executive Airport (Airport). The objective of this project is to rehabilitate the existing East Ramp at the Orlando Executive Airport as identified in the FDOT 2019 Airfield Pavement Management Program report. Construction work generally includes mill and overlay for the asphalt pavement including reconstruction for some isolated areas, associated markings, lighting and signage. For this Project, the Authority has established a DBE Participation Goal of 17%. The Project Scope, the Submission Requirements, and the Disadvantage Business Enterprise (DBE) Participation Program for the Letters of Interest and questions regarding the Project will be reviewed at the Pre-Submittal Conference. The professional services for the Project include, but are not limited to, Scope: study, design services through bid and award, permitting, construction, and other related services necessary for the Project. The Services may include, but are not limited to, airfield design; civil, environmental, structural and electrical engineering design; utilities and infrastructure design; surveying; evaluation and documentation of existing conditions; verification of as-built conditions including field verification of all existing above and underground utilities; cost estimating and scheduling; technical studies; permitting (horizontal, airspace, SJRWMD, city and all other applicable); construction administration and resident engineering; and all other related services including coordination with the Authority, its Consultants, the City of Orlando, FAA, FDOT and all agencies having jurisdiction over the Project. Written inquiries shall be directed to Tuan Nguyen, P.E., Manager of Engineering, Greater Orlando Aviation Authority, Orlando International Airport, 11314 Terminal C Service Road, Orlando, Florida 32824, email: W431@goaa.org. Questions received after close of business on Thursday, October 07, 2021, will not be answered. The method of Contractor Selection has not been Determined at this time.
Conceptual
Transportation Terminals
$500,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 20, 2022
365 Rickenbacker Dr, Orlando, FL
Related To This Project
Orlando, FL
--
Orlando, FL
Bid Date: Nov 19 2024
Orlando, FL
--
Orlando, FL
Bid Date: Dec 03 2024
Orlando, FL
Bid Date: Nov 26 2024
Orlando, FL
Bid Date: Nov 19 2024
Orlando, FL
Bid Date: Nov 20 2024
Orlando, FL
Bid Date: Dec 05 2024
Orlando, FL
Bid Date: Dec 12 2024
Orlando, FL
--
Orlando, FL
Bid Date: Jan 29 2025
Orlando, FL
Bid Date: Nov 04 2024
Orlando, FL
Bid Date: Feb 20 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
