BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Fountain Valley, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of July 15, 2022, an award has been made for this solicitation. Closed solicitation has been included below for reference. ……………….. Type of Award Lump Sum Bid Bond Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Written questions must be sent via e-mail to professionalservices@ocsan.gov. Deadline for Questions -October 19, 2021, 5:00 p.m. GENERAL PROJECT DESCRIPTION The primary objective for this project is to rehabilitate the Plant 2 digesters to provide a reliable, operational performance for the next 15 years. The exterior digester walls and roofing system will be repaired to prevent further water/gas intrusion/release and corrosion. The walkway bridges will be repaired to make them safe for staff access. The hot water mixing system will be replaced between the heat exchanger and circulation pump, including the three-way mixing valve, piping, instrumentation, controls, and appurtenances. The hot water control system will be connected to the PLC. The midrail section of the handrails for seven 80-ft digesters will be repaired and/or modified to be CAL-OSHA compliant. The motor control centers (MCCs) will be replaced. The repair and replacement work will minimize interruptions to the process flow. Digester outages will be limited to two digesters out of service at a time

Post-Bid

Water / Sewer

$500,000.00

Public - County

Renovation, Site Work

139

26

5

7

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
115
Bidding Soon
2,436
All Active Projects
958
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2021

March 1, 2024

img_map_placeholder

To Be Determined, Fountain Valley, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.