Published November 1, 2021 at 8:00 PM
Updated May 14, 2026
Site work and paving for a sidewalk / parking lot in Flat Rock, North Carolina. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The Owner will accept bids for the milling, resurfacing and restriping of the Killian Parking Lot at Blue Ridge Community College. The scope of work will include milling of 2" of the existing asphalt, applying tack, resurfacing with 2" of S9.5C and restriping of the parking areas, ADA areas, crosswalks, etc. Note that all existing brick and concrete pedestrian walkways will remain and should be undisturbed. Below is a more detailed summary of the scope of work: Turnkey project for asphalt paving repairs. The project will include, but is not limited to milling, disposal of rubble offsite, adding ABC stone as needed, grading, wetting and conditioning, applying hot tar tac for bonding, resurfacing with S9.5C NCDOT approved asphalt, rebuilding speed bumps, striping. The scope will include all prep work, remedial work, and finish work that will result in a turnkey project. Provide labor, machinery and all materials for the following: o Mill 2" of existing asphalt o All existing brick and concrete pedestrian walkways to remain and be undisturbed. o Apply hot tar tac for bonding o Resurface with 2" SB9.5 type hot mix compacted o Re-stripe new paving per existing. This will include all existing parking spaces, ADA, directional and stop signage, stop bars, informational and crosswalks The Killian parking lot serves as parking for both the Killian and TEDC building. Work must be done from start to finish on this parcel before work may start on the other parcel. The access road through the Killian parking lot serves as the only route of entry to the upperKillian parking lot, Henderson building, Arts & Science and General Studies building. Work involving the Killian parking lot will have to be coordinated with the BRCC Project Coordinator to prevent parking lot closure or access road closure during scheduled classes and events. This may involve the Contractor working at night or weekends. The contractor should be aware of existing utilities in and adjacent to the project area. All manholes, catch basins, water valve boxes, etc shall be adjusted to meet the new grade of the parking area. All materials and standards shall meet NCDOT standards unless otherwise noted or approved by the Owner prior to construction. The date of availability for the project will be May 16, 2022 with the project to be substantially complete by July 15, 2022. At the date of substantial completion, all work should be completed with the final pay request submitted within one week. Note that work cannot begin until contract documents have been signed by all parties and performance and payment bonds have been provided by the successful bidder. All questions about the project must be submitted to the Project Engineer no later than Monday, October 11, 2021 at 5:00 PM. Questions received after this date and time may not be addressed prior to the bid date
Award
Sidewalks / Parking Lot
$129,345.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 14, 2021
May 16, 2022
140 Alumni Way, Flat Rock, NC
Related To This Project
Flat Rock, NC
Bid Date: Aug 27 2021
Flat Rock, NC
Bid Date: Jun 10 2021
Flat Rock, NC
Bid Date: May 18 2021
Flat Rock, NC
Bid Date: Sep 02 2021
Flat Rock, NC
Bid Date: Mar 26 2026
Flat Rock, NC
Bid Date: Feb 27 2026
Flat Rock, NC
Bid Date: Jan 28 2026
Flat Rock, NC
Bid Date: Sep 23 2025
Flat Rock, NC
Bid Date: Sep 19 2025
Flat Rock, NC
Bid Date: Sep 03 2025
Flat Rock, NC
Bid Date: Aug 21 2025
Flat Rock, NC
Bid Date: Aug 20 2025
Flat Rock, NC
Bid Date: Jul 31 2025
Flat Rock, NC
Bid Date: Feb 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.