BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 15, 2021 at 8:00 PM

Updated November 15, 2023

Site work for a civil project in Nibley, Utah. Completed plans call for site work for a water / sewer project.

The Quarter Circle Drive Canal Piping Project consists of installing approximately 2,200 feet of 42 HDPE DR 32.5 pipe within an existing irrigation ditch. Additionally, a headworks structure will be built at the origin of the pipe and a discharge headworks structure will be built at the termination point of the pipe. There are no road crossings to be completed. This project is located in Nibley, Utah and starts near the intersection of US 165 and Quarter Circle Drive and ends near the intersection of 250 West and Quarter Circle Drive. The canal does run along several back yards in a residential area and will require tree removal and vegetation cleared and grubbing. Attendance at the pre-bid tour is requested and highly encouraged.

Bid Results

Water / Sewer

$917,495.00

Public - City

Site Work

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
47
Bidding Soon
668
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2021

November 12, 2021

Project location map

UT-165 & Quarter Cir Dr, Nibley, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.