BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 13, 2021 at 7:00 PM

Updated May 14, 2026

Renovation of an educational facility in Flat Rock, North Carolina. Completed plans call for the renovation of a educational facility.

Last Day for Questions: October 10th, 2021, at 5:00pm. Question must be in written form by email or USPS letter on or before the date indicated. Submit all questions to: the BRCC Project Coordinator @ marshallm@blueridge.edu Henderson County requests proposals to provide a turnkey project inclusive of all labor, materials, cold weather additives or other additives, curing agents, traffic control, supervision, disposal fees, permits, inspections to demo and dispose existing concrete (approximately 84'-6" x 56') and repour and finish concrete pad located at the Spearman building on the campus of Blue Ridge Community College. This work is to take place during Blue Ridge Community College's Winter break. Contractor is to meet or exceed all requirements and specifications outlined in the engineered drawings. Work area and equipment room to be left in a clean and good condition o Time of Completion: The awarded Contractor may commence work on December 18th, 2021. Contractor must be complete by January 7th, 2022. o Contractor must submit a timeline for beginning and completion of the project. o Install all materials and equipment in accordance with manufacturer's instructions and warranty requirements. o Contractor is to obtain and pay for all required permits and inspections. o Furnish the necessary supervision, labor, tools, equipment, and materials to complete the work outlined in the RFP and pre-bid meeting. o Work schedule limitations to be coordinated with the Blue Ridge Community College Project Coordinator. o Project includes disposal concrete being replaced and debris offsite at the Contractor's expense. The contractor will not be allowed to use College dumpsters. Construction dumpsters will be the responsibility of the Contractor and at the Contractor's expense. o Contractor will provide traffic flaggers for any road or lane closures needed for delivery of equipment or work to be done. o Daily Cleanup of all affected work areas and paths of entry and material delivery or removal. o Any damage to buildings, walkways, pads, patios and foliage will be the responsibility of the Contractor to repair or replace at their expense

Award

Educational

$62,645.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
67
Bidding Soon
896
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2021

December 18, 2021

Project location map

150 E Campus Dr, Flat Rock, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.