Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 18, 2026 at 8:00 PM
Updated March 19, 2026
Renovation of a municipal facility in Alexandria, Virginia. Completed plans call for the renovation of a municipal facility.
This project was initiated with the purpose of replacing the outdated and past their life cycle heating, ventilation, and air conditioning systems (HVAC), life safety systems and perform any necessary structural repairs. This work requires the demolition of the ceilings and lighting, and disruption of the HVAC and life safety systems in the work areas, therefore requiring the temporary relocation of the employees to a swing space for the duration of the work. Since the HVAC, life safety and structural work will have a significant impact in disrupting the workspace and building operations, and requiring the expense of temporary swing spaces, it is reasonable to be performed at the same time with the newly proposed space planning and space reconfiguration. The goal for space planning and reconfiguration will be to resolve the inefficiencies of the building layout, improve circulation and way-finding, improve workflow between various departments, and create a modern, green, healthy, safe, sustainable environment for the employees to work in and for the residents to do business in. The goal of this project will be to provide a modern facility, with energy efficient and environmentally friendly systems, where the incorporation of green materials and improved space efficiency will create a work and business place that is attractive and welcoming, and in line with the City of Alexandria strategic planning and goals, including the Facilities Strategic Plan adopted in 2018. A Feasibility study was completed in spring 2014 and an architectural & engineering firm was engaged to provide design documents and construction estimates to address the immediate and priority repairs required for City Hall. It should be noted that the cost of outfitting a swing space for City Hall functions is included in the separate City Hall Swing Space project. In response to the COVID19 pandemic the City has revised the Workplace Standards Guidelines in order to amend and update how the City can maintain the best qualities and most workable features of the original Guidelines document, yet promote safer, more flexible places of business. With the COVID-19 pandemic the number of city employees working from home increased substantially, thereby also increasing the level of unused or infrequently used office space. As appropriate, projects will adhere to the City’s Green Building Policy, adopted in June 2019, and any future green policies, initiatives, and code requirements that are forth coming As of March 18, 2026, this project is under construction. Construction is expected to last approximately two years.
Under Construction
Municipal
$98,738,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2026
301 King St, Alexandria, VA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
