BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Kansas City, Missouri. Completed plans call for site work for a 38,225-square-foot road / highway.

KCSC desires that Disadvantaged Business Enterprises (DBE) have a maximum opportunity to participate in the performance of City contracts. The project has an overall DBE participation goal, and only firms that have been certified by the Missouri Regional Certification Committee (MRCC) and perform a Commercially Useful Function (CUF) are eligible to satisfy the DBE goal. The Work to be performed under this Contract shall begin on the date specified in the written Notice to Proceed issued by the Director of Public Works, and the Work shall be substantially complete, in accordance with Paragraph 14.04, on or before March 1st, 2024 or date agreed upon at FGMP. Once the Work starts, CONTRACTOR shall continuously pursue completion of the Work. The Work shall be completed and ready for final payment in accordance with Paragraph 14.07 within 60 Calendar Days after the date of Substantial Completion of the Work. CONTRACTOR shall furnish Performance and Maintenance and Payment Bonds, each in an amount at least equal to the Contract Price, as set out in the Contract Documents. Bidders are required to provide Payment, Performance, and Maintenance Bonds equal to 100% of the contract value By submitting its bid, Bidder agrees to meet or exceed the minimum employment goals of 10% minority and 2% women during the term of its contract with the KCSC. The national goal for participation of Disadvantaged Business Enterprises (DBEs) is 10 percent. CITYs overall goal for DBE participation is 20.07 percent. A contract goal of twenty and seven hundredths percent (20.07%) has been established for this procurement. Project/Contract Number: 89022014-003- CS210001AA Job No. 49703 RFQ NUMBER: RFQ #022 - Permanent Striping TSI PROJECT NO. 20202024 The above stated Project runs from the existing streetcar terminus at Union Station on the north end, heading south along Main St. to 51st Street at UMKC. The system will consist of 3.5 route miles of streetcar track with two single crossovers & one double crossover, 15 station stops, roadway & trackway drainage, earthwork, electrical & communications duct banks, five TPSS buildings and foundations, OCS foundations, street lighting, traffic signals, landscaping, sidewalk restoration, overhead catenary systems, traffic signage, and striping. The duration of the Project is expected to be from 2021 through 2025. (T49N, R33W) PROJECT NO. 89022014 C.D. NO. 4 TOTAL VMF SF EXISTING + ADDITION : 38,225 SF

Post-Bid

Roads / Highways

$50,000.00

Public - City

Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
27
Bidding Soon
712
All Active Projects
302
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2021

December 10, 2021

img_map_placeholder

Main St, Kansas City, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.