Site work for a water / sewer project in Santa Cruz, California. Completed plans call for site work for a water / sewer project.

This project is for licensed contractors with a Type A, General Engineering Contractor license to decommission the existing ejector pump, remove it from the vault and isolate the sewer line pipe for connection to the new ejector pump and piping system. The electrical feed to this removed pump will be lockout/tagout disconnected and off. A replacement pump, vault, and piping will be installed at a nearby existing condition location but nearest to the underground force main for ease of making connection to discharge pipe. The Contractor shall complete all or any designated portions of the work called for under the contract in all parts and requirements within 20 working days (except as modified in the technical specifications). The County of Santa Cruz reserves the right to reject any or all bids received as the public good may require. Each contractor shall include in their bid all labor, tools, and materials for a complete and working project for each trade component in conformance with the intent shown on the plans and specifications and specified herein. Prospective bidders must be fully qualified, licensed, certified, and insured to perform the work requested. All work performed must meet all current applicable laws and regulations. In accordance with SB854: 1) No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a). 2) No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. 3) This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Each bidder must submit a bid proposal for the project for which they intend to bid to the General Services Department on the standard forms enclosed. Said proposal shall be accompanied by a cashier's check, a certified check or bidder's bond of ten percent (10%) of the amount of the bid submitted, to be made payable to: the County of Santa Cruz. Bid bonds shall be issued by a corporate surety duly admitted and authorized to issue bonds and undertakings by the State of California. Pursuant to Section 1700, and following, of the California Labor Code, the Contractor shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Those copies shall be made available to any interested party upon request. The Contractor shall forfeit, as penalty, to the County of Santa Cruz, fifty dollars ($50.00) for each calendar day or portion thereof, for each workman paid less than the stipulated prevailing rates for any work done under the contract by it or by any subcontractor under it, in violation of the provisions of such Labor Code County will be the sole judge as to the technical acceptability of any proposals and any award will be as determined most advantageous to the County considering such factors as completeness and responsiveness to Request for Proposal, experience, references, and anticipated costs. The County reserves the right to reject any or all proposals or parts thereof and to waive any informality or irregularity in any proposal. Pursuant to Santa Cruz County Code Chapter 2.33, Contractors and Subcontractors must make good faith efforts to hire Monterey Bay area residents in sufficient numbers so that no less than 50 per cent (50%) of the Contractor's total construction work force, including any subcontractor's workforce, measured in labor work hours is comprised of Monterey Bay area residents. This public works construction project is covered by Chapter 2.33 of the Santa Cruz County Code, and the entire chapter, as amended, is incorporated by reference into the project's specifications and conditions. Any bid proposal, or other response to a solicitation for bid or proposal which proposes or calls for the use of any tropical hardwood or tropical wood products in performance of the contract shall be deemed nonresponsive pursuant to County Code Section 2.37.107. RFI Questions should be communicated to the Project Manager by Friday, October 15.

Award

Water / Sewer

$114,800.00

Public - County

Site Work

9

13

5

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
314
Active Projects
85
Bidding Soon
2,298
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2021

November 29, 2021

Project location map

640 Capitola Rd, Santa Cruz, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.