EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 11, 2021 at 7:00 PM

Updated September 14, 2023

Site work for a civil project in San Francisco, California. Completed plans call for site work for a road / highway; and water / sewer project.

The Work is at various intersections along Leavenworth Street from Pine Street to Post Street in San Francisco, California and consists of pavementn renovation, curb ramp construction, sewer and drainage work, environmental work, traffic signal work, traffic control, and all related work. CONTRACT DURATION: 200 consecutive calendar days from NTP to substantial completion. Final Completion shall occur no later than 60 consecutive calendar days after the date of Notice of Substantial Completion. ESTIMATE: Approximately $2,300,000 REQUIREMENTS: (Refer to Project Manual for a complete list) 1) Class A license required to bid. 2) Pursuant to San Francisco Administrative Code ("Administrative Code") Section 6.25 and Chapter 25 of the Environment Code, "Clean Construction" is required for the performance of all work. 3) Bid discounts may be applied as per Administrative Code Chapter 14B. 4) LBE Subcontracting Participation Requirement is 22% LBE. 5) Good Faith Efforts. In accordance with Administrative Code Chapter 14B requirements, all bidders shall submit documented good faith efforts with their bids, except those who exceed the above stated LBE subcontracting participation requirement by 35%. Bidders must achieve 80 out of 100 points to be deemed responsive. Bidders will receive 15 points for attending the pre-bid conference. Refer to C MD Form 2B. For details, contact Finbarr Jewell by email at Finbarr.Jewell@sfgov.org. 6) For information on the City's Contractor Development Program, call (415) 986-3999 or email cdp@imwis.com. 7) This Project shall incorporate the required partnering elements for Partnering Level 2. Refer to Section 01 31 33 for more details Refer to Section 00 21 13 Appendix B for a guide to joining a Microsoft Teams meeting. Microsoft Teams Meeting Call in (audio only) +1 415-906-4659,,463267616# United States, San Francisco Phone Conference ID: 463 267 616# OR Join on your computer or mobile app Click here to join the meeting https://teams.microsoft.com/dl/launcher/launcher.htmlurl=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_MWFmOTQwYjgtNGE0Yi00ZGNjLThlMzgtMzAzNGM3YmNiM2Nj%40thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%252222d5c2cf-ce3e-443d-9a7f-dfcc0231f73f%2522%252c%2522Oid%2522%253a%252244cffaad-ba0a-4bd9-b6c2- 68ea0ffca317%2522%257d%26anon%3Dtrue&type=meetup-join&deeplinkId=c104d222-3e68-444a-bf62- 78019148f2b6&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true

Bid Results

Roads / Highways

$1,699,805.00

Public - City

Site Work

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Scheduling of Work, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Concrete Finishing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Joint Protection, Preformed Joint Seals, Joint Gaskets
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Terrazzo Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Industrial Furniture, Welding Screens
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Cold Milling Asphalt Paving, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
88
Bidding Soon
1,974
All Active Projects
764
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2021

January 3, 2022

img_map_placeholder

Leavenworth St, San Francisco, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.