Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 21, 2021 at 7:00 PM
Updated January 27, 2024
Site work, paving and outdoor lighting for a civil project in Richmond, Minnesota. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; and for outdoor lighting for a road / highway.
As of December 16 2021 this project has no award yet. 305-124 (TH 23=023), SAP 073-643-007 State Funds In Stearns County on TH 23 from 4700' West of 263rd Ave S to 1400' East of Becker Lake Cir. Grading, Bituminous Mill and Surfacing, Lighting, and Bridge No. 73X08, 73X05, 73X06, and 73J35 9.269 Miles TGB Goal 2.3 Vet Goal 1.7 MNDOT - 100 - Grading, Bituminous Mill and Surfacing, Lighting, and Bridge No. 73X08, 73X05, 73X06, and 73J35 Furnish, install, maintain, and remove all traffic control devices required to provide safe movement of traffic and pedestrians through the Project at all times from commencement of the Work until Project Acceptance. Maintain roads and pedestrian facilities undergoing improvements in a condition that accommodates public traffic. Do not close roads or pedestrian facilities, except as authorized. The Engineer may modify the requirements for traffic control as deemed necessary. The Department will maintain Detour Roads established by the Commissioner for through traffic diverted from the project unless otherwise indicated in the Plan. The use of maintenance crossovers in or near the construction area is permitted if authorized by the Engineer. The Contractor is not responsible for snow removal from roads or pedestrian facilities open to public traffic. Do not suspend operations for the winter until meeting the requirements of 1803.4, "Temporary Suspensions". During authorized winter suspension, the Department will maintain traffic control devices. If traffic control devices are damaged or destroyed, the Department will pay the contractor the value of the device as determined by the Engineer.
Award
Bridges / Tunnels
$41,754,180.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 10, 2021
January 5, 2022
MN-23, Richmond, MN
Related To This Project
Richmond, MN
Bid Date: Aug 17 2022
Richmond, MN
Bid Date: Apr 06 2023
Richmond, MN
Bid Date: Apr 12 2023
Richmond, MN
Bid Date: Apr 23 2020
Richmond, MN
Bid Date: Aug 17 2023
Richmond, MN
Bid Date: Apr 01 2021
Richmond, MN
Bid Date: Apr 10 2025
Richmond, MN
Bid Date: Aug 28 2025
Mapleton, MN
Bid Date: Nov 19 2021
Brownton, MN
Bid Date: Dec 03 2021
Minnetonka, MN
Bid Date: Feb 23 2022
Sartell, MN
Bid Date: Mar 15 2022
Minneapolis, MN
Bid Date: Feb 25 2022
Brooklyn Center, MN
--
Bayport, MN
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
