BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Fair Oaks, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

SCOPE This section specifies anchor bolts complete with washers and nuts as well as powder actuated fasteners. Unless otherwise specified, anchor bolts shall be hotdip galvanized or type 304 or 316 stainless steel. CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows: o Obtain all necessary permits o Move on and off the project site o Construct site work o Furnish and install well pump and motor. Furnish second vertical turbine motor as a spare. o Construct Well Head Pedestal and Well Pad o Furnish and install above ground and below ground piping and appurtenances o Furnish and install sodium hypochlorite feed, control and disinfection facilities o Furnish and install Replacement Gate and Fence o Furnish and Install diesel power standby generator set o Complete modifications to existing Booster Pump Station o Furnish and install electrical and control system wiring, conduits and appurtenances At the District's option the following Add Alternate Work may be included in the scope of improvements o Furnish and install automatic Control Gate o Furnish and install precast architectural concrete wall system o Complete repair of existing Booster Pump Station Roof The work includes furnishing and installation of line shaft driven well pump and 350 horsepower vertical turbine pump and motor capable of delivering not less than 2100 gpm of well water at a total design head of 449 feet. The Contractor shall also furnish to the District a spare 350 horsepower vertical turbine motor. The scope of work includes construction of concrete well pedestal and well pad, above ground and below ground piping, valves and fittings, sodium hypochlorite feed pump, control assembly and piping, new control panels installed in existing Skyway Booster Pump Station Motor Control Center to service new well pump motor, replacement of existing standby generator with a new diesel powered generator set, together with diesel fuel tank and modifications to the existing Skyway Booster Pump Station standby power room to include exhaust louvers and air supply blower together with necessary electrical and control system wiring, conduits and incidentals. Add alternate improvements include furnishing and installation of automatic gate control, replacement of the existing perimeter fencing with precast architectural wall panels and repair of the existing Booster Pump Station Roof. The work will be monitored by the DISTRICT'S REPRESENTATIVE, KASL Consulting Engineers, Inc. together with their electrical Subconsultant, Frisch Engineering, Inc.

Award

Water / Sewer

$1,789,500.00

Public - City

Renovation, Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
72
Bidding Soon
1,502
All Active Projects
632
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.