Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 8, 2024 at 8:00 PM
Updated April 12, 2024
Site work for a water / sewer project in Fair Oaks, California. Conceptual plans call for site work for a water / sewer project.
Provide professional services required to redrill and equip a new groundwater well at the existing Northridge Well Site in Fair Oaks. Project Location: 8251 Kaula Drive. in Fair Oaks, CA 95628 April 15, 2024, at 3:00 PM Proposal Inquires Due Date May 7, 2024 Interviews if needed May 20, 2024 FOWD Board Approval Inquiries about this request for proposal shall be submitted in writing and directed to: Paul Siebensohn Technical Services Manager Phone: (916) 967-5723 E-Mail: psiebensohn@fowd.com The intent of this Request for Proposal is to select a professional consulting firm to develop a set of construction drawings, construction specifications, bid documents, and to provide construction management support required to successfully redrill and equip a new groundwater well at the existing Northridge Groundwater Well site. Scope of Work The following minimum scope of work was developed for the project and all proposals must include listed deliverables for each listed task. As a proposal addendum, it is requested all proposals include additional tasks that the consultant deems important for the successful completion of the project if not listed. 6.1 Task 1 - Preliminary Work and Site Evaluation Complete site survey and general assessment. Prepare a Drinking Water Source Assessment Plan (DWSAP) and submit to it to the Division of Drinking Water (DDW). Address any comments to gain DDW approval. Coordinate completion of necessary Water Quality sampling. Prepare a Low Threat NPDES permit application and process it through regulatory agency for approval.Abandon Existing well. 6.2 Task 2 - Pilot Hole Construction and Initial Geophysical Surveys Review existing well's drilling log and information. Prepare a set of construction specifications for completion of an 8-inch pilot hole at the proposed new well location. Provide Fair Oaks Water District with the list of qualified well drilling contractors.
Conceptual
Water / Sewer
$525,000.00
Public - City
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2025
8251 Kaula Dr, Fair Oaks, CA
Related To This Project
Fair Oaks, CA
--
Fair Oaks, CA
Bid Date: Jun 12 2024
Fair Oaks, CA
Bid Date: Sep 09 2024
Fair Oaks, CA
--
Fair Oaks, CA
Bid Date: Oct 24 2024
Fair Oaks, CA
Bid Date: May 10 2019
Fair Oaks, CA
Bid Date: Mar 12 2025
Fair Oaks, CA
Bid Date: Apr 09 2025
Fair Oaks, CA
--
Fair Oaks, CA
Bid Date: Apr 18 2024
Fair Oaks, CA
Bid Date: Apr 11 2024
Fair Oaks, CA
--
Fair Oaks, CA
Bid Date: Mar 01 2022
Fair Oaks, CA
Bid Date: Nov 05 2021
Fair Oaks, CA
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
