BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Justin, Texas. Working plans call for the renovation of a educational facility.

https://communityimpact.com/dallas-fort-worth/keller-roanoke-northeast-fort-worth/education/2023/10/02/northwest-isd-board-hears-construction-updates-in-meeting/ Oct 04, 2023 Tim McClure, assistant superintendent for facilities for Northwest ISD, updated board members as to the construction progress on several district facilities during their Sept. 25 meeting. The details McClure outlined the construction status at several campuses, including: Northwest High School renovations and additions Pike Middle School replacement Perrin Elementary School Former Hatfield Elementary School remodel to temporary administration building Legacy Learning Center parking lot expansion McClure also spoke about several other projects that are still in the design phase as well. These facilities include: Early childhood centers Nos. 1 and 2 Justin Elementary School replacement Prairie View Elementary School replacement Middle school No. 8 The backstory According to a district website, NISD is the fastest-growing school district in North Texas and one of the fastest growing in the state. Its boundaries span 234 square miles across portions of Denton, Tarrant and Wise counties. During the last 20 years, McClure said the district has averaged about 1,000-1,100 new students each year. During the 2021-22 school year, growth in the district spiked to over 2,500 new students. According to a Northwest ISD website, construction of these new facilities are funded by the sale of bonds in 2021 and 2023. __________________________________________ The scope of this project includes but is not limited to, the following site work: The Construction of a 219,000 square foot building with 1,710 square foot concessions/restroom around the playing field. No athletic field or court will be constructed outside. NISD is reusing the existing fields and courts. Demolition of the existing building except the 2010 North Gym Addition. Fixing the drainage through the existing parking lot and rebuilding a new parking lot for the gym. As of October 2,2023, the owner has selected a Construction Manager. A timeline for construction has not yet been established.

Pre-Construction/Negotiated

Educational

$69,500,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
67
Bidding Soon
3,530
All Active Projects
1,407
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2021

October 23, 2023

img_map_placeholder

To Be Determined, Justin, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.