Published December 7, 2021 at 7:00 PM

Updated October 1, 2024

New construction of a municipal facility in Cresson, Pennsylvania. Completed plans call for the construction of a municipal facility.

Bidders must submit an original with (2) copies, and an electronic copy of the Bid in a sealed envelope clearly marked Bid Proposal for New Cambria County Magistrate Office Building Project with bidders name and address. Any omissions, alterations, additions or deductions not called for, conditional or uninvited alternative bids, or irregularities of any kind, shall be cause for rejection of bid. No responsibility shall be attached to any Township representative for premature opening of a bid not properly addressed and identified. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays, by appointment only, between the hours of 8:00 a.m. and 5:00 p.m. Neither Owner nor L.R. Kimball will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. All bidders must be registered at the office of L.R. Kimball to be eligible to bid. All inquires should be directed to the Project Manager, Brian P. Endler, AIA at 814-419-7918 or via email at brian.endler@lrkimball.com. The work on the contract must be substantially complete within three-hundred (300) consecutive calendar days after the writtennotice to proceed. The successful bidder will be required to comply with the PA Department of Labor and Industry, Prevailing Minimum Wage Predetermination (Act 422 of 1961, P.L. 987 amended), which shall be paid for each craft or classification of all workers needed to perform the contract during the term in which public work is performed, are made part of this specification. No bidder may withdraw his bid for a period of sixty (60) days after the date set for the opening of the bids. Bid Security will be returned to unsuccessful bidders. The successful bidder will be required to furnish and pay for satisfactory performance and payment bonds in the form provided in the Bid Documents (unaltered), each in the amount of one hundred (100) percent of the amount of the contract, within fourteen (14) days of the date of the written Notice of Award of the contract. Failure to furnish bonds and proof of insurance as required by the bidding documents within this time period shall, at the option of the Township, constitute grounds to revoke the bid award and declare the bid security forfeited. Contractor understands that this is a public works contract, and all rights to mechanics or materialmens liens are waived. Contractor will comply with the following laws: Steel Products Procurement Act of March 3, 1978, (P.L.6, No. 3, 1, 73 P.S. 1881 et, seq.); Trade Practices Act (71 P.S. 773.101 et, seq.); Public Works Contractors Bond Law of 1967 (8 P.S. 191 et seq.) if the amount of the contract exceeds $5,000.00; and Public Works Employment Verification Act (43 P.S. 167.1) (Public Works Employment Verification Form must be submitted with the bid). The Cresson Township Board of Supervisors reserve the right to reject any or all bids, to waive any informality, omissions,defects or irregularities in the bids, and to accept and award any contract which, in its judgment, is for the best interest of Cresson Township. The Board of Supervisors may consider the qualifications and experience of the bidders and proposed subcontractors when evaluating bids. If the Contract is to be awarded, it will be awarded to the lowest responsive and responsible Bidder whose evaluation by the Board of Supervisors indicates that the award will be in the best interest of the project. Bid Results Electrical Work - Leverknight Electric - $207,235.00 Plumbing Work - Montgomery Bros. Plumbing & Heating, Llc - $72,000.00 General Construction - Brickley Construction Inc. - $1,025,000.00 Hvac Work Darr Construction, Inc. - $319,900.00

Bid Results

Municipal

$1,624,135.00

Public - City

New Construction

53

24

6

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Specialty Placed Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Anchors, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Decorative Metal
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber, Sheathing, Shop-Fabricated Structural Wood, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Vapor Retarders, Steep Slope Roofing, Shingles and Shakes, Asphalt Shingles, Roofing and Siding Panels, Siding, Flashing and Sheet Metal, Flexible Flashing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Common Work Results for Finishes, Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Tile Carpeting, Painting and Coating, Painting, Interior Painting, Staining and Transparent Finishing
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguisher Cabinets, Storage Specialties, Postal Specialties, Exterior Specialties, Flagpoles
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Furnishings and Accessories, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Direct-Digital Control System for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Breechings, Chimneys, and Stacks
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Overcurrent Protective Device Coordination Study, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Low-Voltage Controllers, Enclosed Controllers, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Trenching and Backfilling, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Fuel Distribution Utilities, Natural-Gas Distribution, Natural-Gas Piping, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
77
Bidding Soon
749
All Active Projects
333
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2021

January 3, 2022

img_map_placeholder

748 Portage Rd, Cresson, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

New Cambria County Magistrate Office Building, District 47-3-03

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.