BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 17, 2021 at 7:00 PM

Updated November 15, 2023

Site work and paving for a civil project in Evanston, Wyoming. Working plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.

As per the Owner the project has been cancelled. Editorial Content Team is actively seeking updated information. County : Uinta It is the responsibility of the Contractor to ensure that the bid envelope is received by Contracts and Estimates personnel, which can be verified by calling 307-777-4487 Bituminous pavement surfacing and hot in-place recycling, chip seal, bridge rehabilitation, fencing and miscellaneous work on approximately 10.40 miles on WYO 150 beginning at RM 2.46 south of Evanston.. The Department of Transportation places the responsibility for timely delivery of bids with the bidder. Bidders may elect to have their bids delivered by any delivery service, or may hand carry their bids to the above street address. Any bids received at the letting after 9:00 AM on the above date will be returned to the bidders unopened. For questions regarding ICX bidding software, please contact Mark Janicek in the Contracts & Estimates office. Office number (307) 777-4214, Mobile: (307) 630-4727 (Available the day prior to and day of letting). In the event Mark is unavailable, please call: Contracts & Estimates. Office number: (307) 777-4487. WYDOT Resident Engineer: : Damon Newsome, P.E., Evanston (307)789-3363 It is mandatory that all bids be prepared electronically using WYDOT Electronic Bid System (EBS) and a hardcopy of the bid be Submitted. An electronic bid bond is preferred, in the amount of 10 percent of the total bid.In lieu of the electronic bid bond, a cashier's check payable to the Transportation Commission of Wyoming inthe amount of 10 percent of the bid is acceptable. The Wyoming Department of Transportation reserves theright to reject any and all bids. Bids will be considered by the Transportation Commission of Wyoming, November 18, 2021. WYDOT - Call Order 005 - Evanston South (Hilliard Flat Section) STRUCTURE NO. FHG SS-500L ML2100B, RM 8.42 T14N, R119W, S30

Final Planning

Bridges / Tunnels

$3,000,000.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
70
Bidding Soon
1,043
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2021

January 10, 2022

Project location map

WY-150, Evanston, WY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.