Site work and new construction of an educational facility in Blue Bell, Pennsylvania. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Project Description: Demolition, cutting and patching, carpentry, wall and ceiling structure infill and patching, sealants, acoustic insulation, steel frames, access doors, interior metal framing, gypsum board, acoustical ceilings, painting, electrical, HVAC, fire protection, and kitchen equipment for the construction of the Hospitality Institute for Montgomery County Community College. Bid Management Program online. Due to the possible inaccuracies in documents procured from other sources, and the potential for an incomplete understanding of the project scope of work, bids submitted by firms who procure these documents from any other source but the authorized source will be considered non-responsive and will be rejected. The General Contractor and Kitchen Equipment Contractor shall have on site superintendents / foreman, contractors, subcontractors & fabricators with a minimum (3) three completed projects of similar size, value & complexity of design as this project. The level of required kitchen/restaurant experience shall meet the design standard of culinary arts space, at a minimum, Collegiate level with professional culinary use. All executing parties shall submit their qualifications and references for review with their Bid. Qualifications shall include, but not limited to, project name, project size, project description, project value, and year of completion. The Owner exercises their right for in person interviews of such said individuals upon review of resume' and references prior to awarding Bids. All Contracts for the Project will be subject to the Prevailing Minimum Wage Determination established by the Commonwealth of Pennsylvania Department of Labor and Industry. Requests for clarification are due Monday, November 1, 2021 5:00:00 PM [(UTC-05:00) Eastern Time (US & Canada)]. The goal participation ranges for this project are: women-owned businesses five percent (5%) to ten percent (10%); minority-owned businesses five percent (5%) to ten percent (10%); other diverse and/or disadvantaged businesses five percent (5%) to ten percent (10%); and local businesses best and good faith efforts. Estimated total construction cost of project is $10,520,050 We understand that the Institute will consist of renovations to the existing building, plus the addition of 15,000 square feet (sf) of floor space. It is unclear at this time if the added floor space will be an overbuild of the existing building, and/or a 15,000 square foot (sf) addition to the footprint of the building. The existing building appears to be one-story with no basement. Based on our knowledge of regional geology, we presume that the structure is supported on conventional shallow spread foundations and perimeter strip footings. Our proposal consists of a geotechnical investigation consisting of 3 test pits conducted around the perimeter of the existing building and 4 test borings performed within the footprint of the proposed addition. The goal ofthe test pitinvestigation is to: A) determine the nature and relative dimensions ofthe existing perimeter footings, and B) determine the existing foundation bearing conditions and an estimate of the allowable bearing capacity. We will subcontract an excavating contractor to supply a mini-excavator and operator to conduct the test pits. The test pits will be located along the outside perimeter of the existing building, in grass areas. We will attempt to determine the dimensions of the existing perimeter footings, the bearing depth, the bearing conditions, and other pertinent information. Without undermining the existing footings, we will extend the test pits to the maximum functional depth of the mini-excavator (approximately 8 to 10 feet) or refusal on bedrock, if shallower. We will log each test pit, sketch footing dimensions, and collect representative bulk soil samples. Upon completion of each test pit, we will backfill with the excavated soil, tamping with the backhoe bucket, and will replace topsoil/sod. Settlement of the test pit excavation is unlikely but may occur. As an add/alternate service, the subcontractor can backfill the test pits in lifts, compacting each lift with a hoe-pac, and then rake/seed/mulch each location

Bid Results

Educational

$666,500.00

Public - State/Provincial

New Construction, Site Work

253

39

122

7

Subscribe For Documents

97 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
443
Active Projects
218
Bidding Soon
4,051
All Active Projects
1,926
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2021

January 3, 2022

img_map_placeholder

340 Dekalb Pike, Blue Bell, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.