Published November 29, 2021 at 7:00 PM

Updated October 1, 2024

Site work and renovation of a civil project in Chester Springs, Pennsylvania. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

For St. Stephen's Greene Sewage Treatment Plant Contract No. WVT-1-GC (General Contract) Contract No. WVT-1-EC (Electrical Contract) This project involves the rehabilitation of St. Stephen's Greene Sewage Treatment Plant, located in the Chester Springs area of West Vincent Township, Chester County, PA. The work generally includes complete demolition of sand bed and sequence batch reactor and replacement with membrane biological reactor and sludge tank, along with associated structures, piping, pumps, valves and controls, and the replacement of the emergency generator as shown on the construction drawings and as specified in the Project Manual. Each bid shall be submitted in accordance with the Instructions to Bidders and must be accompanied by a Bid Bond or Certified Check for not less than ten percent (10%) of the Bid amount payable to the Authority along with an Agreement of Surety certifying that the required Performance and Payment Bonds will be provided to the Bidder. The successful Bidder shall be required to furnish proof of insurance and bonds for Performance, Payment, and Maintenance in such form as meets the approval of the Authority and having as security thereon such Surety company or companies as are approved by the Authority. Questions will be received on PennBid(TM) only until Wednesday November 17, 2021 at 5:00 P.M. This project is subject to applicable provisions of Act 422, Pennsylvania Prevailing Wage Act as amended and the prevailing minimum wage rates issued by the Pennsylvania Department of Labor and Industry, and weekly certified payrolls will be required attesting to this. No Bidder may withdraw his bid within sixty (60) days after the date set for the opening of the bids. BCWSA reserves the right to reject any and all bids for any cause whatsoever, to eliminate any item or items from the contract, to waive any informality in the bids or to make an award to such Bidder who, in the judgment of the Authority, makes the most advantageous bid. Additionally, BCWSA requires Contractor Responsibility Certification at least fourteen (14) days before the date set for the opening of the bids The following professional consultant is responsible to the Authority for the project: Gilmore & Associates, Inc., 65 East Butler Avenue, Suite 100, New Britain, PA 18901. Attention: Will Selders, P.E. The cost estimate for the general contract is between $630,000 and $670,000 The cost estimate for the electrical contract is between $125,000 and $145,000.

Bid Results

Water / Sewer

$180,000.00

Public - County

Renovation, Site Work

21

31

2

5

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Stairs, Metal Ladders
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection
Division 09 - Finishes

Division 09 - Finishes

Tiling, Quarry Tiling, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
333
Active Projects
181
Bidding Soon
2,613
All Active Projects
1,283
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 24, 2021

December 24, 2021

img_map_placeholder

2220 Horseshoe Trail, Chester Springs, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

St. Stephen's Greene Sewage Treatment Plant Rehabilitation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.