BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a bridge / tunnel in Anaheim, California. Working plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This project consists of preventive maintenance for nine city-owned bridges throughout the City. The work will consist of joint seal replacements, patching and erosion control. These repairs will correct minor structural defects and deficiencies that will extend the service life of the bridges and prevent costly rehabilitation, or reconstruction. Construction is anticipated to be completed in FY 2023/24. The nine locations are: - Tustin Avenue over the Santa Ana River - Kraemer Boulevard over the Carbon Canyon Channel - Weir Canyon Road over the Santa Ana River - Lakeview Avenue over the Santa Ana River - Crowther Avenue over the Carbon Canyon Channel - Magnolia Avenue over the Union Pacific Railroad Southbound - Disneyland Drive over Disneyland Park Traffic - Disneyland Flyover over Ball Road - Northbound Disneyland Drive over the Disneyland Tramway Road Matching funds for the resort intersections to be provided by restricted Resort Maintenance District funds. The project is included in the city's 2021/2022-2025/2026 Capital Improvement Program (CIP). As of June 9, 2022, design is complete and construction is scheduled for federal fiscal year 2024-2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Bridges / Tunnels

$1,107,650.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
110
Bidding Soon
2,334
All Active Projects
1,041
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2024

img_map_placeholder

Multiple Locations, Anaheim, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.