BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Buckeye, Arizona. Conceptual plans call for site work for a road / highway.

Install a 6 conduit duct bank on west side of Miller Road between Monroe Avenue and Southern Avenue with splice vaults located adjacent to each traffic signal controller cabinets (NW corners). Install 2-No. 7 pull boxes approximately every 500 feet. Install conduit between the splice vaults and the traffic signal controller cabinets. Install 2-single mode fiber optic cables in the duct bank. Install a Gator Patch in the splice vaults with a single mode fiber optic cable running to the traffic signal controller. As October 21, 2022, this project is currently in the FY 2022-2023 Capital Improvement Plan. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024-2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024-2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$1,093,476.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
10
Bidding Soon
661
All Active Projects
221
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

img_map_placeholder

N Miller Rd, Buckeye, AZ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.