Published May 23, 2022 at 8:00 PM
Updated October 1, 2024
Site work and renovation of a water / sewer project in Hollis, Oklahoma. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Section A 1 1.00 Each Polar Shed Well Building (16'x10') 2 1.00 L.S. Radio Telemetry System with Integration 3 1.00 L.S. Electrical Improvements 4 1.00 L.S. Well Testing and Startup 5 1.00 L.S. Improve Wellhead 6 33.00 S.Y 12' Wide Gravel Access Drive 7 1.00 L.S. Disinfection Section B 1 564.00 L.F. 6" PVC C900 DR-18 Waterline 2 40.00 L.F. Directional Bore & Install 6" PE SDR 11 Waterline 3 1.00 Each 6" Gate Valve & Box 4 1.00 Each 8" Interconnection 5 1.00 Each 6" x 90 Bend 6 1.00 Each 8" x 8" x 8" Tee 7 1.00 Each 8" x 6" Reducer 8 2.00 Each PVC to PE Transition 9 1.00 L.S. Erosion Control 10 1.00 L.S. Hydrostatic Pressure Testing and Disinfection Small business and minority owned business sources are encouraged to bid on this project. A bid bond in the amount of 5% of the total amount bid shall be attached to all bids as a guarantee that the successful bidder will within ten (10) days from the date of notice of award, enter into contract and file the required bonds, and furnish a certificate of Workman's Compensation and General Contractors Liability Insurance. The Town of Hollis reserves the right to reject any or all bids, waive any irregularities or technicalities without assigning any reason therefore, and to make the awards in the best interest of the Owner. (Bid shall be awarded to the lowest, responsive, and responsible bidder). No Bidder may withdraw his bid within 45 days after the actual date of the opening thereof. Bids are solicited and a contract award will be made pursuant to the Public Competitive Bidding Act of 1974 as amended (Title 61, O.S. 1981, Sections 101-136 et seq.). The Town of Hollis reserves the right to withhold any contract awarded subject to the availability of funds. Non-Collusion form must be signed, notarized, and returned with bid or bid will not be accepted. Bidder hereby agrees to commence work under this contract and to fully complete Section A within 60 consecutive calendar days and Section B within 45 consecutive calendar days thereafter. Bidder further agrees to pay as liquidated damages $1000.00 for each consecutive calendar day thereafter as approved in Section 800-05-12.5.2 of the General Provisions.
Bid Results
Water / Sewer
$130,996.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 13 - Special Construction
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 40 - Process Interconnections
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 9, 2022
April 8, 2022
To Be Determined, Hollis, OK
Related To This Project
Hollis, OK
Bid Date: Aug 04 2022
Hollis, OK
Bid Date: May 12 2021
Hollis, OK
Bid Date: Feb 05 2021
Hollis, OK
Bid Date: Jan 04 2019
Hollis, OK
Bid Date: Oct 30 2019
Hollis, OK
Bid Date: Dec 29 2022
Hollis, OK
Bid Date: Mar 16 2023
Hollis, OK
Bid Date: Jun 01 2023
Guthrie, OK
Bid Date: Apr 07 2022
Del City, OK
Bid Date: May 24 2022
Claremore, OK
Bid Date: May 24 2022
Tulsa, OK
--
Broken Arrow, OK
Bid Date: May 24 2022
Tulsa, OK
--
Tulsa, OK
Bid Date: Jul 23 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.