Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 19, 2021 at 7:00 PM
Updated May 15, 2025
Site work and new construction of a transportation facility in Burnaby, British Columbia. Completed plans call for site work for a transportation facility; and for the construction of a 65,000-square-foot, three-story above grade transportation facility.
The Skytrain Operations Control Centre Building (OCC 2) is located at the Translink Operations Facility in Burnaby. It will be a dedicated data centre and control building for the Expo, Millennium and new Broadway SkyTrain networks. A steel structure on grade, with metal and glass envelope system will house all the operating systems and staff facilities in an area of approx. 65,000sqft. TransLink has retained Bird Construction Group LP to act as General Contractor for the construction of new SkyTrain Operation Control Centre (OCC 2) building. Bird is responsible for administering a trade prequalification process/tendering process, entering into contracts with trades directly, and providing construction services for OCC 2. Bird Construction is therefore requesting qualified trades submit a proposal to be considered for prequalification for the following division/trade sections anticipated for the Project under this Request for Prequalification (RFPQ): Division 03 - Concrete 03 05 05 Testing of Concrete and Reinforcement 03 11 00 Concrete Forms and Accessories 03 20 00 Concrete Reinforcing (Building) 03 20 01 Concrete Reinforcement (Site) 03 30 00 Cast-In-Place Concrete (Building) 03 30 53 Cast-in-Place Concrete (Site) 03 35 00 Concrete Floor Finishing 03 40 01 Precast Concrete Division 31: Earthworks 31 05 17 Aggregates and Granular Material 31 13 19 Protection of existing trees and other vegetation 31 15 60 Dust Control 31 22 16.1 Reshaping Existing Subgrade 31 23 01 Excavation, Trenching and Backfilling 31 24 13 Roadway Excavation, Embankment and Compaction 31 63 30 Drilled Micropiles Division 33: Utilities 33 01 30.1 CCTV Inspection of Pipelines 33 01 30.2 Cleaning of Sewers 33 11 01 Waterworks 33 30 01 Sanitary Sewers 33 40 01 Storm Sewers 33 44 01 Manholes and Catchbasins The project value listed reflects the total project estimate.
Post-Bid
Transportation Terminals
$43,000,000.00
Public - State/Provincial
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 25, 2021
February 24, 2022
6700 Southridge Dr, Burnaby, BC
Related To This Project
Burnaby, BC
Bid Date: Jun 19 2025
Burnaby, BC
Bid Date: Jun 11 2025
Burnaby, BC
Bid Date: Jun 12 2025
Burnaby, BC
Bid Date: May 21 2025
Burnaby, BC
Bid Date: Jun 12 2025
Burnaby, BC
--
Burnaby, BC
Bid Date: Jun 11 2025
Burnaby, BC
Bid Date: May 27 2025
Burnaby, BC
Bid Date: May 15 2025
Burnaby, BC
Bid Date: May 16 2025
Burnaby, BC
Bid Date: May 15 2025
Burnaby, BC
Bid Date: May 12 2025
Burnaby, BC
Bid Date: Jun 04 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
