Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Northport, New York. Completed plans call for site work for a water / sewer project.
70Z0G122BPRV24900 ISSUE DATE: 9 NOVEMBER 2021 Contractor shall provide all personnel, equipment, materials, tools, vehicles, supervision, and other items and services required to perform maintenance dredging by mechanical means of the entrance channel into the mooring basin of CG Station Eaton's Neck. It also includes all efforts required for placing the material along a nearby shoreline and incidental related work. Award Details Contract Award Date: Dec 16, 2021 Contract Award Number: 70Z0G122CABCD0005 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 113232180 Contractor Awarded Unique Entity ID (SAM): KXLKEGR2K4M6 Contractor Awarded Name: COASTLINE CONSULTING & DEVELOPMENT, LLC Contractor Awarded Address: Branford, CT 06405-6509 USA Base and All Options Value (Total Contract Value): $469500.00 The total estimated amount of material to be removed from the channel is 9,000 cubic yards of sand, gravel and cobbles. This estimate is 3,000 cubic yards more than previous years' estimates due to approximately 3,000 cubic yards of material being left within the dredge area following FY21 dredging. Dredging work is restricted to mechanical methods. Due to the scheduling restrictions in the NY DEC dredging permit, all dredging work shall be completed no later than March 24th 2022. All work shall be accomplished in accordance with the project specifications (PSN 14071894), Department of Army Permit (NAN-2016-00301), New York DEC Permit (1-4726-00545/00022) (See Appendix A of the Specifications). The dredge spoils shall be disposed at the west 400 feet of the US Coast Guard Beach Site per the USACE and NY DEC permits. Additional work requirements are herein. SPECIAL NOTES: Conduct dredging operations so that navigation through the channel is possible at all times. Dredge quantity of 9,000 cubic yards is an estimate based on an average of the annual dredging over previous years of approximately 6,000 CY plus an additional 3,000 CY of material that was left within the area followig the FY21 dredging. The Contractor shall provide a cost for dredging per cubic yard. That per cubic yard cost will be used for any necessary contract cost adjustment resulting from dredging more or less than the estimated 9,000 cubic yards, within the limits of dredge. Contractor will be compensated for actual quantity of dredge material removed and disposed, within the limits of dredge, as shown on the plans and specifications. Dredge disposal site location is to be the west 400 feet of the Coast Guard Beach, as identified in ACOE Permit # NAN-2016-00301. The period of performance for the project is 110 calendar days from issuance of Notice to Proceed. Applicable permits do not allow work between April 1 and September 1 of any calendar year. All dredging work shall be completed no later than March 24, 2022. In the event that the post-dredge survey indicates that the specified dredge limits have not been met by March 24th, the contractor shall use the time remaining in the month of March to correct the deficiencies. No work is permitted after March 31st due to permitting and environmental restrictions. The estimated value of the procurement is between $250,000 and $500,000. Performance and Payment bonds will be required. Solicitation packages will be available on 9 Novmeber 2021. The date set for receipt of bids is 9 December 2021 at 2:00 pm. The applicable North American Industry Classification System (NAICS) code is 237990, Dredging and Surface Cleanup Activities, with a small business size standard of $30.0 Million. This acquisition is issued pursuant to FAR Part 14 Sealed Bidding and is 100% Set-Aside for Small Business concerns. All relevant solicitation documents, including specifications and drawings may be accessed for download beginning on the date of issue at the following site: https://beta.sam.gov. To receive immediate notification of all changes posted electronically, vendors should click on "Register to Receive Notification". All vendors interested in teaming or subcontracting for this solicitation, should click on "Register as Interested Vendor". In order to view a list of interested vendors, interested parties should click on "View List of Interested Vendors". A list of interested vendors is only available by registering electronically for this solicitation. Vendors MUST be registered in the System for Award Management database through https://www.SAM.gov in order to receive a federal government contract. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Contractor shall provide all personnel, equipment, materials, and all other items and services required to perform maintenance dredging of the entrance channel into the mooring basin of USCG Station Eaton's Neck and all incidental related work. Dredging work is restricted to mechanical methods. The total estimated amount of material to be removed from the channel is 9,000 cubic yards (CY) of sand, gravel and cobbles. This estimate is 3,000 cubic yards more than previous years' estimates due to approximately this amount of material being left within the dredge area following the FY21 dredging. Due to the scheduling restrictions in the NY DEC dredging permit, all dredging work shall be completed no later than 24 March 2022. In the event that the post-dredge survey indicates that the specified dredge limits have not been met by 24 March, the contractor shall use the time remaining in the month of March to correct the deficiencies. No work is permitted after 31 March due to permitting and environmental restrictions.
Award
Water / Sewer
$469,500.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 9, 2021
January 10, 2022
Multiple Locations, Northport, NY
Related To This Project
Northport, NY
Bid Date: Sep 28 2021
Northport, NY
Bid Date: Jan 12 2022
Northport, NY
Bid Date: Sep 06 2022
Northport, NY
Bid Date: Sep 06 2022
Northport, NY
--
Northport, NY
--
Northport, NY
Bid Date: Dec 19 2023
Northport, NY
Bid Date: Aug 17 2023
Northport, NY
Bid Date: Jun 16 2023
Northport, NY
Bid Date: Jul 28 2023
Northport, NY
Bid Date: Jun 15 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.