Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Dallas, Georgia. Contact the soliciting agency for additional information.
As of September 15, 2022, a commissioning agent has been selected. *The previous solicitation is listed below for reference. The Georgia State Financing and Investment Commission (GSFIC), as "Owner", on behalf of the Technical College System of Georgia ("Using Agency" or ''TCSG''), and Chattahoochee Technical College, ('CTC'') is seeking Statements of Qualifications from firms interested in providing Building Commissioning Services for a project known as Project No. TCSG-363 Aviation Training Academy for Chattahoochee Technical College to be constructed on the grounds of the Paulding County Northwest Atlanta Airport in Dallas, Georgia. The Request for Qualifications (RFQ) can be downloaded from the Georgia procurement Registry by selecting the Documents tab above and then selecting the RFQ. Interested firms should check this site periodically for project related updates. Deadline for submission of written questions and requests for clarification (See Section 6) 10/27/2021 2:00 PM The new facility would allow Chattahoochee Technical College to train students in Aviation Maintenance Training Technology programs to diagnose problems and repair aircraft power plants and airframes. Aviation Maintenance Training Technology programs to be provided by Chattahoochee Tech would include certification programs approved by the Federal Aviation Administration (FAA), diplomas, and associate degree programs. The new aviation academy would operate at the Paulding County Northwest Atlanta Airport in Dallas, Georgia. The Paulding Northwest Atlanta Airport is the first jet-capable airport to be built in Georgia in over thirty years. The airport was designed to accommodate the anticipated growth in both private and corporate aircraft operations throughout the next fifty years. The delivery method for this Project will be construction manager at-risk (CM/GC), and, at a minimum, will employ the services of a Design Professional, a Commissioning Agent and the services of a CM/GC. The preliminary Stated Cost Limitation (SCL) or construction cost of the Project is estimated at $24,000,000. The final SCL may be revised by the Owner due to final programmatic requirements, funding availability or other circumstances. Construction documents are anticipated for completion in early in the second quarter of 2022. The start of construction is contingent on the availability of the funding and is anticipated to take approximately 13 to 14 month duration to complete. (All of the dates above are estimates which are subject to change.) The method of contractor selection has not been determined at this time.
Award
Educational
Public - State/Provincial
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2021
400 Nathan Dean Blvd, Dallas, GA
Related To This Project
Dallas, GA
Bid Date: Jan 26 2023
Dallas, GA
Bid Date: Feb 03 2023
Dallas, GA
Bid Date: Feb 03 2023
Dallas, GA
Bid Date: Jun 06 2023
Dallas, GA
Bid Date: Feb 21 2023
Dallas, GA
Bid Date: Feb 13 2023
Dallas, GA
--
Dallas, GA
Bid Date: Mar 10 2023
Dallas, GA
Bid Date: Sep 02 2022
Dallas, GA
Bid Date: Aug 12 2022
Dallas, GA
Bid Date: May 04 2022
Dallas, GA
Bid Date: Aug 11 2022
Dallas, GA
Bid Date: Jul 12 2022
Dallas, GA
Bid Date: Sep 01 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.