BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 10, 2023 at 7:00 PM

Updated January 26, 2024

Demolition, site work, paving and new construction of a mixed-use development in South Padre Island, Texas. Working plans call for site work for a water / sewer project; for the construction of a playground / park / athletic field; playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and for the demolition of a playground / park / athletic field.

** As of today, February 10, 2023 the project is on hold. ** Sealed proposals, addressed to the City of South Padre Island, Texas (Owner) for SEA ISLAND CIRCLE BEACH ACCESS AMENITY IMPROVEMENTS (2023-SL01). The work consists of demolition, removal, and disposal of existing improvements to allow for construction of proposed improvements to include restrooms, changing rooms, ADA compliant foot wash station, general use rinse station, paver walkway, as well as installation of water, wastewater, and electrical utilities. All work shall be completed in accordance with the construction plans, specifications, and contract documents. This project is permitted under the rules and regulations of the Texas General Land Office (GLO) Beachfront Construction Certificate & Dune Protection Permit in the City of South Padre Island, GLO ID No.: BDSPI-22-0321. In compliance with the National Oceanic and Atmospheric Administration and the Texas General Land Office, the following information is to be released with this publication: 60% Federal Funding Allocation: $120,000; Minimum 40% Local Funding Allocation: $80,000. These funding percentages and allocations are based on the funding awarded, not on the total project cost. This project is funded in part by a Texas Coastal Management Program grant approved by the Texas Land Commissioner pursuant to National Oceanic and Atmospheric Administration Award No. NA21NOS4190136. This Contract will comply with all applicable clauses described in Appendix II to Part 200 - Contract Provisions for the non-Federal entity Contracts under Federal Awards. This includes all requirements that are set forth in 2 C.F.R. 200.326 and 2 C.F.R. Part 200, Appendix II. A bid bond in the amount of 5% of the highest amount bid must accompany each proposal. Failure to provide the bid bond will constitute a non-responsive proposal which will not be considered. Failure to provide required performance and payment bonds for contracts over $25,000.00 will result in forfeiture of the 5% bid bond to the City as liquidated damages. The City reserves the right to reject any or all bids, to waive irregularities and to accept the lowest bid which, in the City's opinion, seems most advantageous to the City and in the best interest of the public.

Final Planning

Water / Sewer

$200,000.00

Public - City

Demolition, New Construction, Paving, Site Work

11

24

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
20
Bidding Soon
369
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2023

September 25, 2023

Project location map

Multiple Locations, South Padre Island, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.