Demolition, site work, renovation and addition to an educational facility in Perryville, Missouri. Completed plans call for the addition of a 55,868-square-foot, two-story above grade educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The Perry County D32 School District will receive Bids for the above referenced project. Phase 3 construction of the Perry County Middle School consists of building a two-story addition with a square foot floor area of approximately 31,046 s.f. for the Main Level and 24,822 s.f. for the Upper Level. The two-story building addition will contain the following space/rooms; Classrooms, Support Areas, Media Center and Administration Area, and will be connected to the west side of the Phase 2 FEMA Shelter Building completed in 2020. After the 2021-2022 School Year is completed on May 25, the existing Middle School will be demolished and replaced with a new parking lot and parent drop-off/pick-up drive lane, along with related site utility relocations. The exterior wall construction of the Phase 3 building addition will be load bearing concrete masonry units with masonry veneer. The roofing system installed over the metal roof decking will be a TPO adhered systems over cover board and rigid insulation. Interior work consists of load bearing concrete masonry walls and metal stud framed walls with gypsum board, structural columns and framing members, concrete floor slabs (slab-on-grade and elevated slabs), flooring, ceilings, interior painting, manufactured casework, visual display boards, doors and frames, toilet partitions and toilet accessories, light fixtures, VRF System and plumbing fixtures. Reference Drawings for additional items and information associated with Scope of Work for this Project. Available Project information includes the following: 1. Bid Documents will be available after: October 26, 2021. 2. Mandatory Pre-bid: November 9, 2021 at 3:30 pm cst. 3. Bids Due: November 23, 2021 at 3:30 pm cst. 4. Contract Awarded: December 8, 2021. 5. Contractor can have access to site: December 9, 2021. 6. Building Substantial Completion: May 20, 2023. 7. Middle School Building Demolition and new parking lot: May 27, 2023. 8. Parking Lot and Site Substantial Completion: July 31, 2023. 9. Project completion and turned over to Owner: August 14, 2023. Direct all questions to Jeff Keim at jkeim@inciteDesignStudio.com Download PDF Files $ 162.36 Burn PDFs to CD-ROM $ 162.36

Award

Educational

$12,304,200.00

Public - County

Addition, Demolition, Renovation, Site Work

203

31

121

9

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
34
Bidding Soon
751
All Active Projects
288
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 23, 2021

December 9, 2021

img_map_placeholder

326 College St, Perryville, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.