BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 9, 2025 at 8:00 PM

Updated July 10, 2025

Site work and outdoor lighting for a transportation facility in Pembroke Pines, Florida. Completed plans call for outdoor lighting for a transportation facility; and for site work for a transportation facility.

The project, as we understand it, includes airfield lighting upgrades, and re-construction of the connector taxiways along Taxiway E, in North Perry Airport (HWO), in Pembroke Pines, Florida. A new electrical vault is also anticipated to be constructed southwest of the Air Traffic Control Tower, south of Taxiway L. The purpose of this study was to provide geotechnical input to the design team to assist in the evaluation of the merits of the planned construction. Airfield Lighting Improvements Question deadline - 5 May 2025 5:00 PM Online

Award

Transportation Terminals

$3,022,450.00

Public - County

Outdoor Lighting, Site Work

91

17

2

8

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
48
Bidding Soon
1,813
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2025

July 14, 2025

Project location map

101 SW 77th Way, Pembroke Pines, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.