BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of an educational facility in San Lorenzo, California. Completed plans call for the construction of a 9,310-square-foot, one-story above grade educational facility; and for site work for a educational facility.

Solicitation- 20-052, 20-1809 Notice is hereby given that the governing board ("Board") of the San Lorenzo Unified School District ("District") will receive sealed bids for the following project, Bid No. 22-02, Bid Package San Lorenzo High School New Building Part 2 Civil work Project ("Project" or "Contract"):The Project consists of, but is not limited to: 1. Preparation of the Site for the Installation of (3) new modular classroom buildings (to be fabricated and installed by American Modular Systems (AMS)). This includes but is not limited to: a. The excavation for rat slab installation necessary for modular classroom installation (Modular building foundation and Rat Slab to be installed by AMS) b. Installation of equipment inside modular buildings, including television monitors, ceiling hoist systems, and building signage c. Electrical and Low Voltage work inside the building as noted in the drawings. This includes: i. Security, Fire Alarm System, Public Address System, Data and Internet ii. All underground conduits per project plans. iii. Conduits inside the buildings are to be provided by AMS (without pull strings). General Contractor required to complete wiring, and all necessary programming for low voltage work. iv. Electronic Door locks to be installed by American Modular Systems including its programming. 2. Provide all Utility Connections to new modular buildings 3. Fabrication and installation of (2) new metal canopies and their foundations a. Installation will need to occur after the placement of the new modular buildings 4. Install all new landscaping, irrigation, paving, and Outdoor Gathering Area hardscapes. Additional Site work includes but is not limited to: a. New Paving and Striping at multiple locations on Campus b. Demolition of existing portable classrooms and fencing. Portable demolition to take place after project completion and occupancy. c. Installation of new fencing and gates To bid on this Project, the Bidder is required to possess one or more of the following State of California Contractor License(s): A and/or B The Bidder's license(s) must remain active and in good standing throughout the term of the Contract. To bid on this Project, the Bidder is required to be registered as a public works contractor with the Department of Industrial Relations pursuant to the Labor Code. The Bidder's registration must remain active throughout the term of the Contract. Pursuant to Public Contract Code section 20111.6, only prequalified bidders will be eligible to submit a bid for this Project. Any bid submitted by a bidder who is not prequalified shall be non-responsive and returned unopened to the bidder. Moreover, any bid listing subcontractors holding C10 (Electrical Contractors), C12 (Earthwork and Paving Contractors), C-36 (Plumbing Contractors), if used, who have not been prequalified, shall be deemed nonresponsive and will not be considered. A prequalification application can be obtained from the District website: www.slzusd.org. Please go to Departments- Business Services- Facilities and Construction or by emailing Ms. Jennifer Edwall at jedwall@slzusd.org. A bid bond by an admitted surety insurer on the form provided by the District, cash, or a cashier's check or a certified check, drawn to the order of the San Lorenzo School District, in the amount of ten percent (10%) of the total bid price, shall accompany the Bid Form and Proposal, as a guarantee that the Bidder will, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Work. The successful bidder will be required to either meet the DVBE goal of three percent (3%) participation or demonstrate its good faith effort to solicit DVBE participation in this Contract if it is awarded the contract for the Work. Bid Questions Due 11/24/21 Must email the completed form the day of being on site to Behrooz Danish, P.E., M. ASCE, Director of Facilities and Construction bdanish@slzusd.org. All questions about the project shall be sent to this email address as well. 1. Preparation of the Site for the Installation of (3) new modular classroom buildings (to be fabricated and installed by American Modular Systems (AMS)). This includes but is not limited to: a. The excavation for rat slab installation necessary for modular classroom installation (Modular building foundation and Rat Slab to be installed by AMS) b. Installation of equipment inside modular buildings, including television monitors, ceiling hoist systems, and building signage c. Electrical and Low Voltage work inside the building as noted in the drawings. This includes: i. Security, Fire Alarm System, Public Address System, Data and Internet ii. All underground conduits per project plans. iii. Conduits inside the buildings are to be provided by AMS (without pull strings). General Contractor required to complete wiring, and all necessary programming for low voltage work. iv. Electronic Door locks to be installed by American Modular Systems including its programming. 2. Provide all Utility Connections to new modular buildings 3. Fabrication and installation of (2) new metal canopies and their foundations a. Installation will need to occur after the placement of the new modular buildings 4. Install all new landscaping, irrigation, paving, and Outdoor Gathering Area hardscapes. Additional Site work includes but is not limited to: a. New Paving and Striping at multiple locations on Campus b. Demolition of existing portable classrooms and fencing. Portable demolition to take place after project completion and occupancy. c. Installation of new fencing and gates 3. To bid on this Project, the Bidder is required to possess one or more of the following State of California Contractor License(s):

Bid Results

Educational

$2,689,000.00

Public - City

New Construction, Site Work

126

23

29

5

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
89
Bidding Soon
1,878
All Active Projects
786
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2021

February 4, 2022

img_map_placeholder

50 E Lewelling Blvd, San Lorenzo, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.