BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 24, 2022 at 7:00 PM

Updated November 15, 2023

Renovation of an educational facility in Powder Springs, Georgia. Completed plans call for the renovation of a educational facility.

This project consists of replacement of switchgear, panelboards and emergency lighting upgrade. Sealed bids are requested by Cobb County School District from approved vendors for construction of: Tapp Middle School Electrical Upgrades All communications concerning these documents must be submitted in writing to the Cobb County School District (CCSD) Procurement Services Department either by email, or U.S. mail. Email is the preferred method of communication. Email correspondence is to be directed to Wendy Bell at wendy.bell@cobbk12.org. Correspondence sent by U.S. mail is to be sent to CCSD Procurement Services Department, 6975 Cobb International Blvd., Kennesaw, Georgia 30152, Attn: Wendy Bell. Only written inquiries received via email, or U.S. mail by 3:00 PM ET on November 17, 2021 will be considered. Bids must be accompanied by a bid bond made payable to the Cobb County School District, in the amount equal to 5 percent of the bid price. (Certified Checks Not Acceptable.) The successful bidder will be required to furnish a Performance Bond and a Payment Bond acceptable to the Cobb County School District in an amount equal to 100 percent of the contract price and executed by a Surety Company licensed to do business in the State of Georgia and listed in the Department of the Treasury Circular 570, latest edition. Bonding of Subcontractors: Include in the Base Bid, Performance and Labor and Materials Payment Bonds, each in 100% of the subcontract sum, for each Subcontractor having a contract of $50,000.00 or more for Roofing, HVAC, Plumbing, Sprinkler System and Electrical Work as required by the General Conditions. Cobb County School District reserves the right to award the project on whatever basis is in the interest of the Owner and to accept or reject any or all bids and to waive technicalities and informalities.

Award

Educational

$831,098.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
98
Bidding Soon
2,062
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2021

January 3, 2022

Project location map

3900 Macedonia Rd, Powder Springs, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.