Site work and paving for a mixed-use development in Ankeny, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Bids will be considered by the City of Ankeny City Council at its meeting at 5:30 P.M. on the 3rd day of January, 2022, in said City Council Chambers. The City Council may award a Contract at said meeting, or at such other time and place as shall then be announced. The SE Crosswinds Drive RISE - Phase 2 project includes construction of PCC pavement, related storm sewer, sanitary sewer, water main extension, subdrain, earthwork, ditching, and SWPP controls generally located on SE Convenience Drive, SE Corporate Woods Drive, and SE 90th Street east of I-35 and south of SE Corporate Woods Drive. The construction improvements include approximately 10,462 SY of 9" PCC pavement, 1,118 SY of 9" PCC pavement widening, 475 SY of 10" PCC pavement widening, 1,849 LF of 8" PVC sanitary sewer, 2,325 LF of 10" PVC C900 water main, 1,294 LF of 12" PVC C900 water main, 2,559 LF of RCP storm sewer, 29,416 CY of Class 10 excavation, subgrade preparation, modified subbase, subdrain and construction of sidewalk ramps. Other associated improvements include traffic control, erosion control, surface restoration, and miscellaneous associated work necessary to complete the project. Failure to submit a fully completed and accurate Bidder Status Form with the Proposal may result in the Proposal being deemed non-responsive and may result in the Proposal being rejected. The City of Ankeny reserves the right to defer acceptance of any bid for a period of thirty (30) calendar days after receipt of bids and no bid may be withdrawn during this period. liquidated damages of Five Hundred Dollars ($500.00) per calendar day will be assessed for work not completed within the designated Contract term(s) General: The Contractor shall fully complete the overall project within one hundred twenty (120) working days after the project has been substantially completed for both stages. Work on the improvement shall be commenced any time after a written Notice to Proceed is issued, no later than April 18th , 2022, and shall be completed as stated below. The Notice to Proceed will be issued after the preconstruction conference, which is expected to occur in March 2022.

Bid Results

Roads / Highways

$2,500,025.00

Public - City

Paving, Site Work

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
35
Bidding Soon
572
All Active Projects
237
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2021

April 18, 2022

img_map_placeholder

Multiple Locations, Ankeny, IA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.