BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of an educational facility in Storrs Mansfield, Connecticut. Completed plans call for the renovation of a educational facility.

Remove existing gravel-surfaced built-up roofing systems down to concrete/gypsum roof decks. Prepare and repair roof deck to receive new roofing system. Replace the roof with new vapor barrier, tapered insulation (where applicable), coverboard, and EPDM roof membrane. Increased insulation thickness is expected to meet current energy code requirements. Raise existing vent pipes and penetrations to accommodate increased roofing thicknesses. Provide additional blocking at all parapets to maintain existing height relative to increased roof thicknesses. Remove and replace parapet caps in all locations sloped toward the roof surface. Remove and replace roof overflow scuppers. Raise penetration curb heights to maintain eight (8)-inch minim flashing height over new roofing. Remove and replace roof hatches. Remove and reinstall exhaust vents, and other associated equipment as required. Provide guardrails for serviceable equipment located near the roof edge. Remove and replace existing drain bowls and strainers. Connect to existing drain leaders. Remove and replace gutters and downspouts. Connect applicable downspouts to existing drain leaders. Remove and replace five (5) courses of brick at each penthouse level to access and remove the existing stainless-steel drip edges. Replace existing drip edges with stainless-steel pan flashings including rear leg, end dams, and new through-wall membrane cavity flashing. Provide new termination assembly for the roof membrane. Coordinate new through-wall flashing height relative to new roofing. Remove and replace roof access ladders. Coordinate height and installation with new roofing height and masonry restoration. Remove and replace roof access and mechanical penthouse doors. Raise threshold height to coordinate with new roofing height. Q&A (RFI) Due Date and Time March 28, 2022 2:00 PM Scope Review Meeting (with lowest qualified bidder, to be determined after Bid Opening) April 11, 2022 2:00 PM This bid has six alternates. They are as follows: Alternate 1: Sodding - Perform Sodding for landscape restoration work as specified in Section 32 9223 Alternate 2: Waterson Roof Add roof replacement and associated work at Watson Hall. Alternate 3: Belden Hall Roof - Add roof replacement and associated work at Belden Hall. Alternate 4: Eddy Hall Roof - Add roof replacement and associated work at Eddy Hall. Alternate 5: Ryan Hall Roof - Add roof replacement and associated work at Ryan Hall. Alternate 6: Von Der Mehden - Add roof replacement and associated work at Von Der Mehden Hall.

Bid Results

Educational

$1,182,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
800
Active Projects
448
Bidding Soon
5,516
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2022

May 16, 2022

Project location map

Multiple Locations, Storrs Mansfield, CT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.