BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Zephyr Cove, Nevada. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Contract Award Date: Apr 19, 2022 Contract Award Number: 6982AF22C000019 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: DKEDXW1LK5P3 Contractor Awarded Name: Herback General Engineering, LLC Contractor Awarded Address: Minden, NV 89423-8903 USA Base and All Options Value (Total Contract Value): $5228520.00 This is not a request for bid - plans and specifications are not available. This project will be advertised as full and open competition with hubzone price preference. Project number: nv flap us50(1) Project name: round hill pines access Project description: the nv flap us50(1), round hill pines access project is located approximately 0.5 miles south of zephyr cove, nv near lake tahoe. The project is proposing to widen us 50 and construct a new access road to the round hill pines beach resort. The purpose of the project is to increase safety and improve accessibility for visitors entering and exiting the round hill pines beach resort from us 50. The current us 50 entrance configuration into the round hill pines beach resort has safety concerns due to the limited sight distance for vehicles traveling in both directions along us 50 and unprotected turning movements across us 50 for vehicles accessing the resort. Scope of the work: the project consists of 0.34 miles of construction on us 50 and 0.13 miles of new entrance to the round hill pines beach resort (round hill pines access road). Us 50 work includes widening to accommodate a median left turn lane and acceleration lane, as well as a mill and overlay of existing us 50. Round hill pines access road work involves new roadway construction of the access road between the new intersection with us 50 and the forest service parking area. Large fills up to approximately 30 feet are anticipated near the intersection of us 50 and the round hill pines access road. Other improvements include roadway drainage improvements, signing, and striping. Significant quantities: 20420-0000 embankment construction: 50,400 cuyd 40301-0100 asphalt concrete pavement, type 1: 2,850 ton 61401-0000 lean concrete backfill: 330 cuyd 63506-0500 temporary traffic control, flagger: 3,500 hour Anticipated schedule: Advertisement: february 2022 Contract award: april 2022 Notice to proceed: april 2022 Construction complete: october 2022 Engineer's estimate: The proposed project is estimated at a cost between $1 million and $5 million. Miscellaneous: Tree removals on united states forest service land are anticipated to occur prior to start of this project. The contractor will be responsible for disposal of removed trees from the project site. This project will tie into a united states forest service project that will be completed prior to start of this project. Trpa grading season for the project area is may 1 october 15. The contractor will be required to provide a qualified biologist to conduct surveys in the construction limits for active bird nests within 10 days prior to vegetation removal from march 1 - august 31. If active nests are identified, notify the co and delay vegetation removal. The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$5,228,520.00

Public - Federal

Paving, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
19
Bidding Soon
365
All Active Projects
152
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2022

May 4, 2022

img_map_placeholder

US-50, Zephyr Cove, NV

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.